Laserfiche WebLink
Santa Ana: Traffic Signal and Streetlight Maintenance (RFP NO.: 24-046) '" ' ' - <br /> TRAFFIC <br /> Work Plan/Scope of Work <br /> It is always the goal of Yunex Traffic to tailor our services around our customer's needs. We <br /> understand that throughout the term of a contract, those needs may change. We approach all <br /> our contracts with the same vision; build a partnership with the City's staff and work towards <br /> achieving common goals set forth through that partnership. We realize that this is an ever- <br /> evolving process and that is why we believe that the only successful route is through <br /> establishing common goals. This methodology and a commitment to service will be applied to <br /> every aspect of our services for the City of Santa Ana. <br /> Routine Maintenance <br /> We will execute a comprehensive monthly routine maintenance program as outlined in the City's <br /> Appendix Attachment 1 (Scope of Work), as recommended by the manufacturer, and as listed <br /> below. Yunex Traffic will also maintain, at the same unit price, additional traffic signals and <br /> appurtenant devices as they are installed or become a part of the maintenance requirements of <br /> the city. <br /> Yunex Traffic technicians will, at a minimum, perform the following tasks on the City's traffic <br /> control systems monthly: <br /> Routine maintenance is typically scheduled by the technician as they are more aware of <br /> the geography of the area. He/she will take into consideration contract requirements and <br /> your preference when scheduling routine preventive maintenance. <br /> Once our technician arrives at the location, he will complete a job hazard analysis (JHA) <br /> determining any potential hazards at the location. Following the JHA, they will secure the <br /> area with proper traffic control as referenced in the most recent editions of the CAMUTCD <br /> and W.AT.C.H. Handbooks and in accordance with the city's traffic control requirements. <br /> Our technician will clean and vacuum the controller and battery backup cabinets (if <br /> equipped) and ensure the cabinet vents are un-obstructed, the air filter is clean, properly <br /> inserted, and secure (air filters will be replaced quarterly). During this process, your Yunex <br /> Traffic technician will perform the following checks inside the controller cabinet: <br /> o Confirm the controller cabinet is securely mounted to the foundation and inspect <br /> the seal for deterioration. ;14;fx s f r <br /> Excessive dampness and %� ', <br /> plant/animal intrusion inside the <br /> >< • <br /> controller ' ' .. . <br /> cabinet will be , l� <br /> • <br /> reported to the city and repaired „ , L , + <br /> immediately. - i I 1.`, • <br /> o Verify fan operation and ensure ••• � F � I'% <br /> the thermostat is set to 85 ' <br /> degrees Fahrenheit and that " . �'; r ,' <br /> there is sufficient airflow • • <br /> through the cabinet. ! y� <br /> , F . <br /> a Inspect cabinet hardware (i.e., v A <br /> door gaskets, hinges, locks, <br /> etc.) for proper operation. All j,, <br /> deficiencies will be repaired and C r c • , ' <br /> reported to the city. <br /> ©2024 Yunex Traffic 17 <br />