My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. (8)
Clerk
>
Contracts / Agreements
>
C
>
CHAMBERS GROUP, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 5:22:38 PM
Creation date
7/1/2024 5:22:37 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2023-194-02A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
5/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saigon Reform Presbyterian Church CHAMBERS <br /> City of Santa Ana <br /> GROUP <br /> • Air Quality,GHG Evaluation,and Focused Traffic Impact Study Reports <br /> Project Management hours have been incorporated into this scope of work. Project Management tasks cover <br /> communication and coordination with the City, coordination with staff for the completion of impact analysis, and <br /> Project progress and budget monitoring.Attendance at any City or public meetings,including Planning Commission and <br /> City Council meetings,is not included.Should the Project require further coordination than anticipated,or if attendance <br /> at public meetings is requested, Chambers Group can attend on a time and materials basis. <br /> Assumptions <br /> • This scope does not include any onsite survey, testing, data recovery, analysis, monitoring, reporting, or similar <br /> programs. <br /> • The cost assumes peer review of documents/reports prepared as noted in the RFP. If any additional technical <br /> studies require peer review,or if there are significant changes required after the first round of review, an updated <br /> scope and cost will be necessary. <br /> • This scope assumes no more than two rounds of review, and one virtual meeting lasting no more than 1 hour to <br /> discuss the comments. <br /> • This scope assumes that all necessary project information to support the analysis will be received. <br /> • If the project description, site plan, or technical studies are revised beyond addressing comments,any revisions to <br /> the comments will be done under a separate estimate. <br /> • This assumes the CEQA Exemption Memorandum and NOE does not exceed 50 pages in text and no other technical <br /> studies are received. <br /> COSts <br /> The services described in each task will be performed on a fixed-fee basis.This estimate was determined based on the <br /> information provided in the RFP, and the expected level of effort to review and provide suggested revisions/analysis, <br /> and assumptions provided above. For contract information, refer to master agreement,A-2023-194-02. <br /> TASK COST ESTIMATED SCHEDULE <br /> Task 1:CEQA Exemption Memorandum $5,556.00 Upon receipt of all documentation, <br /> Task 2:Air Quality and GHG Evaluation $1,127.00 preliminary review comments will be <br /> Task 3:Focused Traffic Impact Studyprovided within 2 weeks. <br /> ff p $4,485.00 <br /> Responses to the comments received <br /> TOTAL $11,168.00 from the City or Project Applicant will be <br /> reviewed within 1 week. <br /> 040 2 <br /> Est <br /> as"d339 <br /> 1;"ili‘'1979 www.chambersgroupinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.