My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 1 -1999
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 1 -1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:47 PM
Creation date
3/19/2003 9:26:22 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS
Contract #
A-1999-106
Agency
Public Works
Council Approval Date
6/6/1999
Expiration Date
7/6/2000
Insurance Exp Date
10/1/2000
Destruction Year
2005
Notes
John Garthe Reservoir Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> <br />D0 <br /> <br />Evaluate chlorination alternatives. Prepare preliminary layout of <br />recommended chlorination facilities. <br />Summarize noise control and soundproofing recommended for the well head <br />facility. <br />Select well pump based on recommendation based on well testing. <br /> <br />Preliminary Site Improvements <br />1. Show demolition of old Bristol Reservoir, wood frame Well No. 14 and hydro- <br /> generating buildings. Show required grading/fill requirements. <br />2. Provide sketches of proposed modifications to Phase I reservoir. This will <br /> include modification of the west wall and roof extensions, proposed new roof <br /> coating, and proposed pedestrian security cage/bars on the stairway to the <br /> reservoir roof. <br />3. Provide sketches of the proposed modifications to the concrete stairs from the <br /> hydro-generation building into the underground vault. <br /> <br />Preliminary Design Submittal <br />1. Prepare submittal to the City of the preliminary design. <br />2. Meet with City and obtain comments, revisions, etc. <br />3. Modify preliminary plans as required and resubmit to the City. <br /> <br />TASK NO. 5 - GEOTECHNICAL INVESTIGATION (work to be performed by <br /> Converse) <br /> <br />Preliminary Work <br />1. Assemble and review available geologic, boring, and earthwork information. <br />2. Perform a site reconnaissance. <br />3. Contact Underground Services Alert (USA) and City personnel to locate <br /> existing utilities at the site. <br /> <br />Bo <br /> <br />Field Drilling <br />1. Drill three (3) hollow-stem auger borings to depths of 30 to 50 feet. <br /> <br />4. <br />5. <br /> <br />6. <br /> <br /> The <br />borings are proposed to be located northwest, west (at mid-reservoir), and <br />southeast of the existing reservoir. <br />At the northwest and southeast locations, a piezometer will be installed to <br />measure the fluctuations in groundwater levels during the rainy season. <br />Core the existing concrete reservoir bottom at two locations and dig shallow 5- <br />to 1 O-foot deep hand auger borings. <br />Perform Standard Penetration Tests. <br />Locate and log all field exploration work, and obtain soil samples for <br />laboratory testing. <br />Record the groundwater level in each boring and subsequently in each <br />piezometer. The piezometers will be protected so that readings can be taken up <br />to, and possibly after, the time of construction. <br /> <br />City of Santa Ana <br /> <br />ASL Consulting Engineers <br /> <br />JOHN GARTHE RESERVOIR IMPROVEMENTS PHASE II <br /> 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.