My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 1 -1999
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 1 -1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:47 PM
Creation date
3/19/2003 9:26:22 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS
Contract #
A-1999-106
Agency
Public Works
Council Approval Date
6/6/1999
Expiration Date
7/6/2000
Insurance Exp Date
10/1/2000
Destruction Year
2005
Notes
John Garthe Reservoir Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> <br />Do <br /> <br />Fo <br /> <br />Go <br /> <br />H0 <br /> <br />Reservoir Plans - Civil and Mechanical <br />· Inlet, outlet, and overflow piping and details <br />· Reservoir inspection manhole <br />· Roof vent, roof hatch, ladder, and details <br />· Repair of existing reservoir roof and security cage <br /> <br />(2 sheets) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br /> <br />Reservoir Plans - Structural <br />· General notes and typical details <br />· Foundation/floor plan <br />· Roof slab plan <br />· Wall sections and elevations <br />· Roof slab sections <br />· Reservoir details <br /> <br />(1 sheet) <br />(2 sheets) <br />(2 sheets) <br />(2 sheets) <br />(1 sheet) <br />(2 sheets) <br /> <br />Wellhead Facilities - Civil and Mechanical <br />· Piping plan and sections <br />· Chlorination facilities <br />· Flushing discharge plan, profile, and details <br />· Well and piping details <br /> <br />(1 sheet) <br />(2 sheets) <br />(1 sheet) <br />(2 sheets) <br /> <br />Wellhead Facilities - Structural <br />· General notes and typical details <br />· Exterior building elevations <br />· Hydro-generating vault plan and details <br />· Foundation plan <br />· Roof framing plan <br />· Craneway framing plan <br />· Foundation/framing structural details <br />· Typical structural details <br />· Block wall structural details <br /> <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(3 sheets) <br />(1 sheet) <br />(1 sheet) <br /> <br />Wellhead Facilities - Electrical and Controls <br />The well control system will be designed to operate with the City's computerized <br />telemetry system. A new remote terminal units (RTU) and a telephone line will be <br />provided. New electrical service and transformer and telephone service requirements <br /> <br />will be coordinated with appropriate utility companies. <br />· General notes and symbols <br />· Electrical site plan <br />· Single line diagram and elevations <br />· Wellhead electrical plan/conduit schedule <br />· Electrical details <br />· Control diagram and details <br /> <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(1 sheet) <br />(2 sheets) <br /> <br />City of Santa Ana <br /> <br />JOHN GARTHE RESERVOIR IMPROVEMENTS PHASE II <br /> 6 <br /> <br />ASL Consulting Engineers <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.