My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 1 -1999
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 1 -1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:47 PM
Creation date
3/19/2003 9:26:22 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS
Contract #
A-1999-106
Agency
Public Works
Council Approval Date
6/6/1999
Expiration Date
7/6/2000
Insurance Exp Date
10/1/2000
Destruction Year
2005
Notes
John Garthe Reservoir Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> <br />TASK NO. 13 - <br /> <br />Ao <br /> <br />START-UP, 0 & M MANUAL, AND RECORD DRAWINGS <br /> <br />Assist with establishing testing activities for the Wellhead Facilities. <br />1. Review contractor's proposed testing and start-up procedure. <br />2. Analyze procedures with City staff. <br />3. Assist the contractor with any approved modifications to the testing and startup <br /> procedure. <br /> <br />Prepare 0 & M manual based on information supplied by the contractor. <br /> <br />Prepare record drawings based on data provided by the contractor and/or City <br />construction manager. <br /> <br />ITEMS NOT INCLUDED <br /> <br />1. The City will pay directly for NPDES permitting, all laboratory testing of water <br /> samples collected from discharge monitoring during development, and from the final <br /> well blend sampling after construction of the new well has been completed. <br /> <br />2. Reproduction and distribution of the plan and specification package to contractors. <br /> <br />3. Payment of all fees for permits and applications. <br /> <br />4. City will assist in processing plans for City and County issued permits. <br /> <br />5. The City will supply all necessary field survey for the project. <br /> <br />6. Distribution and mailing of all addendum. <br /> <br />7. Processing of Contract Documents. <br /> <br />8. Construction management services including contract administration, change order <br /> assistance, monitoring of construction schedule, field observation, and wellhead <br /> facilities testing. <br /> <br />City of Santa Ana <br /> <br />ASL Consulting Engineers <br /> <br />JOHN GARTHE RESERVOIR IMPROVEMENTS PHASE II <br /> 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.