My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 3-2000
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 3-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:51 PM
Creation date
3/19/2003 10:00:26 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS (TETRA TECH)
Contract #
A-2000-164
Agency
Public Works
Council Approval Date
10/2/2000
Expiration Date
7/1/2002
Insurance Exp Date
10/1/2001
Destruction Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN <br /> <br />ASL Consulting Engineers proposes to provide the following detailed scope of work: <br /> <br />1. Preliminar7 Design <br /> <br />During preliminary design ASL will collect and review all "as-built" drawirfgs, reports <br />and calculations. Our team will visit the site and verify the existing conditions. <br /> <br />In addition, our team will accompany representatives from CAL/OSHA and State <br />Health to the site to determine existing conditions and to identify any applicable code <br />changes since the 1998 TIC report. <br /> <br />Preliminary plans will be prepared and reviewed with City staff and local specialty <br />contractors. Prior to the start of detailed final design drawings our team will evaluate <br />all comments and verify the construction cost estimate. This will help to ensure that <br />the project can be completed under budget. <br /> <br />2. Construction Plans <br /> <br />Plans and specifications will be completed in MicroStation format. The design will <br />meet the requirements of AWWA, City of Santa Ana, and Title 8 of California Code <br />of Regulations (CAL/OSHA). <br /> <br />We envision the following plan set: <br /> <br />g. <br />h. <br />i. <br />j. <br /> <br />Title Sheet <br />Index, Abbreviations, etc. <br />Exterior Ladder Plan <br />Interior Ladder Plan ' <br />Catwalk, Balcony and Top of Reservoir Access System <br />Roof Vents, Overflow and Access Hatches <br />Inlet/Outlet Piping and Altitude Valve Vault <br />Foundation Sump Pump <br />Mechanical Details <br />Structural Details <br /> <br />The entire plan set will be approximately 10 sheets. Final submittal to the City will be <br />on mylar plan sheets as well as electronic copies of CAD files. <br /> <br />ASL Consultin~l En~llneers <br /> <br />City of Santa Ana <br />ELEVATED WATER TANK IMPROVEMENTS 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.