Laserfiche WebLink
WORK PLAN <br /> <br />We have assumed a total of eight (8) site visits and construction meetings will <br />be required. These will include: <br /> <br />One (1) during submittal period <br />Four (4) during installation <br />Two (2) during touch and final acceptance <br />One (1) to resolve change orders <br /> <br />The following sheet contains our estimated hours for each task of the project. <br /> <br />ASL Consultlncj Engineers <br /> <br />City of Santa Aha <br />ELEVATED WATER TANK IMI'ROVEMENTS 5 <br /> <br /> <br />