My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 3-2000
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 3-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:51 PM
Creation date
3/19/2003 10:00:26 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS (TETRA TECH)
Contract #
A-2000-164
Agency
Public Works
Council Approval Date
10/2/2000
Expiration Date
7/1/2002
Insurance Exp Date
10/1/2001
Destruction Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUMES <br /> <br />Mark W. Bush, P.E. <br />Design Engineer <br /> <br />Education: <br /> <br />University of California, lrvine <br />B.S. Civil Engineering, 1997 <br />B.S. Environmental <br />Engineering, 1997 <br /> <br />Registration: <br /> <br />Registered Civil Engineer <br />California No. 60477 <br /> <br />Professional Affiliations: <br /> <br />American Society of Civil <br />Engineers <br /> <br />American Water Works <br />Association <br /> <br />Orange County Water <br />Association <br /> <br />Mr. Bush is experienced in analysis and design of water and reclaimed <br />water pipelines, pump stations and reservoirs. He has also been <br />responsible for completing the design of wastewater collection systems <br />and lift stations. <br /> <br />Summary of Rehtted Experience <br /> <br />· John Garthe Reservoir Improvements, Phase II, City of Santa <br /> Ana- The Phase II improvements include the demolition of a 5 <br /> M.G. gunite reservoir, buildings and a pump station and the <br /> construction of two new 5 M.G. circular prestressed concrete <br /> reservoirs, drilling and equipping of Well No. 39, a new potable <br /> well (1350 feet deep), installation of 3 sodium hypochlorite <br /> disinfection facilities and site landscaping improvements. <br />· Talega Domestic and Non-Domestic Reservoirs - Project <br /> Engineer for this project which consists of a 6 MG domestic water <br /> reservoir, a 4 MG nondomestic water reservoir and associated <br /> pipeline, valving, electrical and instrumentation to serve the <br /> southerly portion of the Talega Valley. The domestic reservoir will <br /> be a partially buried pre-stressed concrete reservoir on a hillside <br /> graded by the Developer. The nondomestic reservoir will be an <br /> aboveground steel reservoir located on the same site. <br />· Ladera Ranch Reservoir, Santa Margarita Water District - <br /> Project Engineer for engineering design and construction support <br /> services for the construction of a 4 MG partially buried prestressed <br /> concrete reservoir. Included in the design is a 24-inch diameter <br /> domestic and nondomestic inlet-out with transmission main, <br /> overflow/storm drain pipeline facilities, a paved access road, <br /> electrical service and site improvements. <br />· Zone 4 and 6 Reservoirs Artificial Circulation Evaluation, <br /> Irvine Ranch Water District -- Project Engineer for the <br /> evaluation of inducing artificial circulation or mixing of stored <br /> water in an attempt to increase water quality in the system. Baffles, <br /> submersible mixers and alternative operational scenarios were <br /> evaluated with cost estimates and present worth analyses used to <br /> quantify the costs and benefits. In addition, computer modeling <br /> using computational fluid dynamics of the preferred mixing <br /> alternatives were performed to evaluate the effectiveness of the <br /> alternatives to support recommendations for the improvements. <br />· Zone 1, 4, and 8 Reservoirs Preliminary Seismic Analysis, <br /> Irvine Ranch Water District - Design Engineer for the analysis of <br /> existing conditions and recommended improvements for <br /> inlet/outlet, drain and overflow piping. <br />· Moulton Peak Reclaimed Water Steel Tank Reservoir, Moulton <br /> Niguel Water District - Project Engineer for a 1.5 million gallon <br /> steel tank on Moulton Peak. Project included site concems due to <br /> viexvshed and physical site restrictions. <br /> <br />ASL Consultln~l En~lJneers <br /> <br />City of Santa Aha <br />ELEVATED WATER TANK IMPROVEMENTS 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.