Laserfiche WebLink
RESUMES <br /> <br />Mark W. Bush, P.E. <br /> <br />· 2.8 MG Floating Cover Reservoir, Golf Dimensions - Design <br /> Engineer for 2.8 MG reclaimed water surface reservoir located on <br /> Desert Willow Golf Course in Palm Desert. Project included <br /> floating cover, meter vault, access road and discharge piping. <br />· Toll Plaza Reservoir, Silverado Contractors - Design Engineer <br /> for the 200,000 gallon surface reservoir and floating cover <br /> providing domestic water and fn'e protection for the Eastern <br /> Transportation Corridor Toll Plaza. <br />· Mathis Domestic Water Reservoir Conversion to Recycled <br /> Water, Moulton Niguel Water District - Design engineer for the <br /> design of inlet/outlet and drain piping modifications of existing <br /> facilities to convert the existing domestic water reservoir to receive <br /> recycled water. Included in the project is the design of a 1500 gpm <br /> horizontal split case pump for make-up needs, and the installation <br /> of sampling taps to monitor water quality. <br /> <br />ASL Consultln~l Encdineers <br /> <br />City of Santa Ana <br />ELEVATED WATER TANK IMPROV£MZ~rrs 13 <br /> <br /> <br />