My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 3-2000
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 3-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:51 PM
Creation date
3/19/2003 10:00:26 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS (TETRA TECH)
Contract #
A-2000-164
Agency
Public Works
Council Approval Date
10/2/2000
Expiration Date
7/1/2002
Insurance Exp Date
10/1/2001
Destruction Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUMES <br /> <br />Steve Tedesco, P.E. <br /> <br />· North County Distribution Pipeline, San Diego County Water <br /> Authority -- Project Manager for the design of this 1.0 MG <br /> prestressed concrete regulatory structure. <br />· Moulton Peak Reservoir, Moulton Niguel Water District -- <br /> Project Manager for design and construction management and <br /> observation services for this 4.0 MG steel reservoir. <br />· 2.0 MG Steel Highlands Reservoir and 5.0 MG Steel Pacific <br /> Park Reservoir, Moulton Niguel Water District -- <br /> Responsibilities as Project Manager included direction of design, <br /> inspection services and construction management. <br />· Morro Hills Reservoir, Oceanside - Project Manager for the <br /> design of this 5.0 MG steel reservoir. <br />· Hunt Highway Water Production Facility, Chandler, Arizona -- <br /> Project Manager for the project which included 2,000 gpm booster <br /> pump station and 2.0 MG steel reservoir. Project incorporated <br /> blending of raw well water with treated system water. <br />· Bush Way Water Production Facility, Chandler, Arizona -- <br /> Project Manager for the project which included 2,000 gpm booster <br /> pump station and 2.0 MG steel reservoir. Project incorporated <br /> blending of raw well water with treated system water. <br />· Big Canyon Reservoir Floating Cover, City of Newport Beach - <br /> - Project Manager for the design of the.floating cover for the 200 <br /> million gallon Big Canyon Reservoir. <br />· 2.8 MG Floating Cover Reservoir, City of Palm Desert -- Project <br /> Manager for the design of the floating cover for a 2.8 MG <br /> reclaimed water surface reservoir located on Desert Willow Golf <br /> Course. <br />· Toll Plaza Reservoir, Silverado Contractors - Project Manager <br /> for the design of the 200,000 gallon surface reservoir and floating <br /> cover providing domestic water and fire protection for the Eastern <br /> Transportation Corridor Toll Plaza. <br /> <br />ASL Consultin~t Engineers <br /> <br />City of Santa Ana <br />ELEVATED WATER TANK hMPROVEMENTS 15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.