Laserfiche WebLink
RESUMES <br /> <br />Steve Tedesco, P.E. <br />QA/QC <br /> <br />Education: <br /> <br />Polytechnic Institute <br />of New York <br />B.S. Civil Engineering, 1979 <br /> <br />Registration: <br /> <br />Registered Civil Engineer <br />California No. 39261 <br /> <br />Professional Affiliations: <br /> <br />American Society of Civil <br />Engineers <br /> <br />American Water Works <br />Association <br /> <br />Orange County Water <br />Association <br /> <br />WateReuse Association <br /> <br />Mr. Tedesco is experienced in the planning, analysis, design, and <br />construction management of water supply, water and reclaimed water <br />distribution, and wastewater collection systems. He has authored <br />several master plans and infrastructure planning studies for sewer, <br />water, and reclaimed water programs. He understands collection and <br />treatment of wastewater and is knowledgeable regarding the key issues <br />associated with supplying and storing domestic and reclaimed water. <br />He has designed and directed the design of water and wastewater <br />systems, pump stations, water supply reservoirs, water transmission, <br />and wastewater collection mains. <br /> <br />Mr. Tedesco is familiar with computerized hydraulic techniques in <br />distribution system design and surge control. He is also experienced in <br />assessment engineering and construction management. <br /> <br />Sulnmary of Related Experience: <br /> <br />· Bristol Reservoir, Santa Ana -- Project Manager for this 25.0 MG <br /> reservoir provided domestic water storage and distribution in the <br /> city of Santa Ana. <br />· Camino De Bryant Reservoir, Yorba Linda Water District -- As <br /> Project Manager, this 3.2 MG reservoir.provides water storage for <br /> Yorba Linda Wgter District's Zone 5 pressure zone. It is a <br /> conventionally reinforced rectangular shaped concrete reservoir <br /> with a hopper bottom floor. <br />· Prestressed Concrete Reservoirs in the Irvine Coast <br /> Development, Irvine Ranch Water District -- Project Manager <br /> for the design of the 2.0 MG Zone 2 Domestic Reservoir, 6.5 MG <br /> Zone 4 Domestic Reservoir, 2.6 MG Zone 6 Domestic Reservoir <br /> and 2.6 MG Zone G Reclaimed Water Reservoir at the prestigious <br /> Newport Beach Coast Development. <br />· Laguna Heights Reclaimed Water Reservoir, Moulton Niguel <br /> Water District -- Project Manager for design and construction <br /> management and observatiOn services for this 2.0 MG prestressed <br /> concrete reservoir. <br />· Joint Regional Treatment Plant, Moulton Niguel Water District <br /> -- Project Manager for the design of the AWT expansion which <br /> included a 3.0 MG prestressed reservoir and a 11.4 mgd reclaimed <br /> water pump station. <br />· Weir Canyon Reservoir, Sycamore Canyon Development -- <br /> Project Manager for the design and construction management of <br /> this 4.2 MG reservoir that provides domestic water for the <br /> SyCamore Canyon Development. Conventional concrete <br /> construction was used in the roof, columns, and floor of the <br /> reservoir. The reservoir walls are prestressed with vertical <br /> tensioning bars and horizontally with wire wrapping. <br />· 66 MG Twin Oaks Reservoir(s), Vallecitos Water District -- <br /> Principal-in-Charge for the preliminary design and final design for <br /> the construction of two 33 MG buried circular concrete prestressed <br /> reservoirs. <br /> <br />ASL Consultinf~ En~lineers <br /> <br />City of Santa Aha <br />ELEVATED WATER TANK IMPROVEMENTS 14 <br /> <br /> <br />