Laserfiche WebLink
HUNT HIGHWAY RESERVOIR <br /> <br />2.0 MG Steel Tank <br />Design & Construction <br />Observation <br />Part of Project to Blend <br />Treated Water & Raw <br />Well Water & Pump It <br />Into the City's System <br /> <br /> Chandler. Arizona <br />Client: CITY OF CHANDLER <br /> <br />Construction Cost: $1.8 million <br /> <br /> MOULTON PEAK RESERVOIR <br /> Aliso Viejo, California <br /> Client: MOULTON NIGUEL WATER D/STRICT <br /> <br />· 4.0 MG Steel Reservoir '~' :'"' <br />· Design & Construction <br />Management/Observa- <br />tion <br />· Construction Cost: $1.8 <br />million <br /> <br /> CHAPARRAL PINES RESERVOIR <br /> Payson, Arizona <br />Client: CHAPARRAL PINES INVESTORS, L.L.C. <br /> <br />1.5 MG Tank <br />Design & Construction <br />Support <br />Originally for Golf <br />Course but has Recently <br />Been Connected to Cen- <br />tral Portion of Town of <br />Payson <br /> <br />Construction Cost: $800,000 <br /> <br /> IRVINE COAST ZONE 6 & G RESERVOIRS <br /> Irvine. California <br /> Client: IRVINE RANCH WATER DISTRICT <br /> <br />Design & Construction <br />Support of 2.6 MG Do- <br />mestic Water Reservoir <br />Design & Construction <br />Support of 2.6 MG <br />Reclaimed Water <br />Reservoir <br /> <br />· Located in Prestigious Newport Coast Development <br />'. Const~tction Cost: $3.5 million <br /> <br />Bush Way <br />City of Chandler <br /> <br />Break Pressure Reservoirs <br />Rowland Water District <br /> <br />Steel Reservoir <br />City of Oceans/de <br /> <br />Twin Oaks Reservoir <br />Vaflecitos Water D/strict <br /> <br />Cypress Reservoir <br />Los Angeles County DPW <br />B'ristol Reservoir <br />City of Santa Ana <br /> <br />Steel Reservoir <br />City of Pomona <br /> <br />Various Reservoirs <br />Moulton Niguel Water District <br /> <br />Design and construction support <br />for 2.0 MG concrete tank <br /> <br />Design of 6.0 MG and 7.3 MG <br />steel reservoirs <br /> <br />Design of 5.0 MG steel reservoir <br />adjacent to existing 5.0 MG reservoir <br /> <br />Design and construction support <br />of two 33 MG concrete reservoirs <br /> <br />Design of 5.0 MG steel reservoir <br /> <br />Design.and construction manage- <br />ment of 25,0 MG reservoir <br /> <br />Design of 4,0 MG steel reservoir <br />with an alternative design for concrete <br /> <br />Design and co0struction support <br />of 9 reservoirs from 2.0 to 5.0 MG <br /> <br />$2.5 million <br /> <br />$2.9 million <br /> <br />$1.5 million <br /> <br />$34 million <br /> <br />$1.75 million <br />$11 million <br /> <br />sgo0,o00 <br />$5 million <br /> <br /> ASI. Cons~ ting Eng;neers <br />o...~rwm'~xr~.tt~zrt?LE~,Ro~urx~,dJ a.~ 2oo0 <br /> <br /> <br />