Laserfiche WebLink
SECTION 21: The Santa Ana Municipal Code is hereby <br />amended by adding a Section to be numbered Section 8-356, <br />said Section reads as follows; <br /> <br />1.18. <br /> <br />which <br /> <br />Sec. 8-356. Plumbing Plan Check Fee. <br /> <br />Part one of the Plumbing Code is amended by adding Section <br />Plumbing Plan Check Fee. <br /> <br />Section 1.18. Plumbing Plan Check Fee. Whenever plumbing <br /> <br />plans are required by the building official, plan check fees <br />shall be in accordance with the following: <br /> <br /> 1. Large Installations. For plan checking systems where <br />work involved fixtures that discharge more than 180 waste fixture <br />units: <br /> <br /> A. Complete project: <br /> <br /> (All systems except fire sprinkler, <br /> and swimming pool piping.) <br /> <br /> 1. Apartment building, three stories and lower. <br /> <br /> (a) 15% of the plumbing permit fee. <br /> <br /> 2. All other buildings. <br /> <br /> (a) 50% of the plumbing permit fee. <br /> <br /> B. Individual systems: <br /> <br /> (1) Potable water and standpipe systems only: <br /> <br /> (a) 60% of the applicable plan check fee in <br /> item A above, $10 minimum. <br /> <br /> (2) Conventional waste and vent systems only: <br /> <br /> (a) 40% of the applicable plan check fee in <br /> item A above, $7.50 minimum. <br /> <br /> (3) Ail other systems: <br /> (a) Fee shall be as shown in subsection 2 below. <br /> <br /> 2. Other Installations. For plan checking individual sys- <br />tems not included in plans listed under subsection 1 above: <br /> <br /> A. Building Sewers, each system .............. $10.00 <br /> B. Combination waste and vent piping systems, <br /> each system ................................. 7.50 <br /> <br /> C. Drainage sumps and ejectors, each system...10.00 <br /> <br /> D. Dry standpipes, each building .............. 10.00 <br /> E. Fuel gas piping systems .................... 7.50 <br /> F. Potable water piping systems: <br /> <br /> (1) Where building supply is one and one- <br /> half inches or less, each building .... 10.00 <br /> <br />irrigation sprinkler <br /> <br /> <br />