My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-1213
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1974 (NS-1194 - NS-1241)
>
NS-1213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:04:55 PM
Creation date
6/26/2003 10:08:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-1213
Date
7/1/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. NS-1213 <br />PAGE THREE <br /> <br />Before recommencing, proceeding with, or doing any electric <br />wiring authorized by but not done before expiration of any <br />such permit, a new permit shall be obtained therefor, and the <br />fee for such permit shall be the fee required for a new permit. <br /> <br />91-11. Revocations and suspensions of permits. The director <br />of building safety may suspend or revoke any electrical permit <br />~or any of the following reasons: <br /> <br />If any reason is found to exist which would have been <br />cause for denial of such permit. <br /> <br />e <br /> <br />Any material misrepresentation or falsity in the appli- <br />cation upon which said permit was issued. <br /> <br />e <br /> <br />For failure to comply with the provisions of the sec- <br />tions in this code pertaining to electricity; after due <br />notice of corrections and the time limit therefor has <br />expired; or for failure to comply with other codes of <br />this jurisdiction that may be related to or appertain <br />to the sections in this code pertaining to electricity. <br /> <br />91-12. FEES <br /> <br />(a) <br /> <br />The fees required in this section must be paid to the <br />director of building and safety for each electrical <br />installation for which a permit is required by this <br />code o <br /> <br />(b) <br /> <br />No permit shall be issued to any person, firm or corpora- <br />tion unless all fees for permits or additions to permits <br />are paid in full. <br /> <br />(c) <br /> <br />There shall be a basic permit issuance fee of $3.00 for <br />all electrical permits issued in addition to other fees <br />provided for below. <br /> <br />(d) Fee Schedule: <br /> <br />(1) New construction and relocation on residential <br />single family, multi-family, hotels, motels and all <br />other H and I occupancies): <br /> <br />One and one half cents (1 1/2 ~) per square <br />foot per floor; plus $5.00 for each service <br />meter; and <br /> <br />One cent per square foot for detached or attached <br />garages or carports on same service; and <br /> <br />$1.25 for each room where electrical radiar~ceil- <br />ing heat is installed. <br /> <br />(2) Ail occupancies, except as provided for in section <br />91-12(d) (1) above, including alterations, additions, <br />repairs, and improvements; use fee schedules as follows: <br /> <br />Service meter ................................ $5.00 <br /> <br />Each self-contained factory wired approved unit, <br />such as air conditioners, home applicances, heaters, <br />vegetable cases, drinking fountains, heating appli- <br />ances, multiple outlet assemblies, etc ....... 2.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.