My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-1213
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1974 (NS-1194 - NS-1241)
>
NS-1213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:04:55 PM
Creation date
6/26/2003 10:08:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-1213
Date
7/1/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. NS-1213 <br />PAGE FOUR <br /> <br />Radiant ceiling heat per room ................ 1.25 <br /> <br />Lighting Fixtures <br /> <br />Each .... 25 <br />Each <br />Each additional fixture on same standard ...... 25 <br /> <br />Power A~paratus <br /> <br />Generators, motors, transformers, rectifiers, <br />synchronous converters, capacitors, industrial <br />heating, cooking or baking equipment, and other <br />apparatus as follows: <br /> <br />Rating in horsepower (HP), Kilowatts (KW), or <br />kilovolt amps (KVA) <br /> <br />Up to and including 1 HP, KW, KVA each ...... $1.50 <br />Over 1 and not over 10 HP, KW, KVA each ..... 3.00 <br />Over 10 and not over 50 HP, KW, KVA each .... 6.00 <br />Over 50 and not over 100 HP, KW, IVA each...10.00 <br />Over 100 and not over 500 HP, KW, KVA each..15.00 <br />Over 500, each .............................. 25.00 <br /> <br />These fees include all switches, circuit breakers, <br />contractors, relays, and other directly related <br />control equipment. <br /> <br />Outlets and General Use Switches <br /> <br />Each ............................... .-.- - $ .25 <br />NOTE:''EaCh'5'feet or fraction thereof of multiple <br /> outlet assembly shall be counted as one <br /> outlet. <br /> <br />Signs and High Potential Gas Tube Lighting <br /> <br />Each Sign .................................... 7.50 <br />NOTE: This shall include all necessary control <br /> equipment. <br /> <br />Temporary Service <br /> <br />Temporary electrical service prior to final <br />approval or occupancy, each meter ........... 25.00 <br />Temporary work with service (occupied resi- <br />dential) each meter ......................... 10.00 <br />Temporary work with service (occupied com- <br />mercial) each meter ......................... 15.00 <br /> <br />Temporary Power - Construction <br /> <br />For services supplying a temporary power <br />pole, pedestal, or piggyback ................ 5.00 <br />For a system of distribution and utilization <br />poles for temporary construction power, each <br />pole ........................................ 3.00 <br /> <br />Temporary Construction Lightin~ <br /> <br />500 Lamps or less ........................... 2.00 <br />Over 500 Lamps .............................. 4.00 <br /> <br />Each time clock or ~hoto electric cell ..... 1.25 <br /> <br />Swimmin~ Pool ............................... 12.00 <br /> <br />Busways, Special Raceways, under floor duct, <br />trolley or plug-in busways each 100 foot or <br />fraction thereof ............................ 5.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.