Laserfiche WebLink
e <br /> <br />NOTE= <br /> <br />The existing storm drain <br />(culvert) system at the <br />southeast corner of'Fourth <br />and French Streets will <br />require reconstruction. <br /> <br />3) The following improvement plans= <br /> <br />Ca) <br /> <br />Street improvement plans for <br />Third and Fourth Streets and <br />French Street. <br /> <br />(b) <br /> <br />Traffic signal reconstruc- <br />tion at the southeast corner <br />of Fourth and French Streets <br />and as required. <br /> <br />(c) Storm drain facilities. <br /> <br />(d) <br /> <br />Dedicate spandrels at the <br />corners of Third and Fourth <br />Streets and French Street <br />with radii of twenty-seven <br />feet. <br /> <br />(e) <br /> <br />"NO STOPPING ANYTIME" signs <br />will be posed on Fourth and <br />French Streets. <br /> <br />Prior to the release of utilities on the <br />project, complete the following: <br /> <br />a) Construct the following street im- <br /> provements: <br /> <br />1) Fourth Street <br /> <br />(a) <br /> <br />Remove all curbing, sidewalk <br />and street lights. <br /> <br />(b) <br /> <br />Reconstruct new A-2 curb and <br />gutter at the same location <br />as the present curb, joining <br />the curb easterly. The curb <br />is at 28 feet from street <br />centerline. <br /> <br />(c) <br /> <br />Remove and reconstruct pav- <br />ing adjacent to the new curb <br />and gutter and as required. <br /> <br />(d) <br /> <br />Construct a full eight foot <br />wide sidewalk adjacent to <br />the curb with street tree <br />wells. <br /> <br /> <br />