Laserfiche WebLink
Electrical Code; <br />Sound and Energy; <br />Zone Protection. <br /> <br />State Requirements for <br />and the Federal Flood <br /> <br />2. Separate permits are required for the <br /> removal of existing structures. <br /> <br />C. UTILITIES AGENCY <br /> <br />1. Pay Sewer connection fees. <br /> <br />2. Pay O.C.S.D. No. 1 fees. <br /> <br />3. Pay the cost of water service and fire <br /> protection facilities installation. <br /> <br />NOTE: <br /> <br />This development must make its <br />sewer connection to the existing <br />8" sewer in French Street as only <br />5" mains exist in Third and Fourth <br />Streets. <br /> <br />D. PUBLIC SERVICES AGENCY <br /> <br />1. Prior to the issuance of a building per- <br /> mit, complete the following: <br /> <br />a) Pay the drainage assessment fee of <br /> $2,285.~ per acre. <br /> <br />b) <br /> <br />Pay the Transportation System Im- <br />provement fee of 1% of the estimated <br />construction value. <br /> <br />c) Submit the following to the Public <br /> Services Agency: <br /> <br />1) <br /> <br />A run-off study based on a ten <br />year frequency to show existing <br />and proposed facilities and meth- <br />ods of draining this site without <br />exceeding the capacity of any <br />street. <br /> <br />2) <br /> <br />A final grading plan and/or an <br />on-site drainage plan, showing <br />the direction and means of flow <br />to the adjacent streets or storm <br />drain. <br /> <br /> <br />