Laserfiche WebLink
EXHI~,~ r E <br /> <br />EIR HITIGATION I~EASURES <br /> <br />Project Impact Summary (cent) <br /> <br />Impact Topic and Impacts <br /> <br />· Water (Continued) <br /> <br /> .Wastewater <br /> <br />. The proposed project would increase by 43,333 gpd the amount <br />et wastewater that would be transmllted lo, and Irealed by, <br />the Orange Count/Sanitation Dislrict No, 7. <br /> <br />Mitigalion Measures <br /> <br />, Non.water using methods el cleaning and maintenance <br />shall be used on the site,.(Recommended as Part el this <br /> <br />, The applicant shall contribute to the OCSD's Connection Fee lund <br />at a rate o! $300.00 per 1,000 square last of commercial <br />development space. <br /> <br />, The applicanl shall work with Ihs OCSD Io Identily <br />possible on-stir melhods el reducing Ihs load atranglh el <br />proJecl-generated wastewater, .(Recommended as parl el <br />this EIR) <br /> <br />Level o~I impact <br />Allot Mitlgallon <br /> <br />Not Signilicant <br /> <br />· Storm Drainage <br /> <br />. Project site grading and construction could Increase the amounl <br />of on.sJle erosion which could result in increased sediment in <br />storm drains, <br /> <br />· The (ollowlng measures are proposed In order to reduce the <br />magnitude el short.term conslruclion-relaled Impacts Io Cily <br />storm drainage facilities, <br /> <br />· Oudng Ihs grading and conslruction period, the applicanl shall <br />place sandbags around Ihs site perimeter to prevent sediment.filled <br />runolf Item being deposited in City storm drains. <br /> <br />Not Significant <br /> <br /> <br />