Laserfiche WebLink
EXHI~.'f E <br /> <br />EIR MITIGATION MEASURES <br /> <br />Project Impact Summary (cent) <br /> <br />tmpact ?optc and Impacts <br /> <br />· Storm Drainage (Continued) <br /> <br />, Operation gl the proposed prelect is expected to increase <br />the amounl gl $11e runoll by a negligible amount (2.86 cls). <br /> <br />Mitigation Measures <br /> <br />· Should any proiecl.genoraled sediment be deposited in Cily <br />storm drains, the applicant shall lurid any required clean-up to <br />the mutual satistaction gl the City and the applicant. <br />. Exposed soits shall be covered with soil binding mateial <br />(such as burlap and/or last growing grasses) as soon as possible <br />Io prevent soil erosion during storms. <br /> <br />· The Ioliowlng measures should be implemenled in order to reduce <br />the potential lot impacts during project operation. <br /> <br />· The applicant shall prepare a storm drainaQe plan and submit <br />it to the City Engineer lot review and approval. Such a <br />plan shall Identily the location and specilicalions gl <br />proposed drainage facililies. <br /> <br />· Parking area mainlenance and sweeping shall be conducted <br />regularly (without the use of water) to reduce the amount gl <br />pollutants entering the City drainage system. <br /> <br />Levol ol Impacl <br />Allot Mitlo~tlon <br /> <br />Nol Significanl <br /> <br /> <br />