Laserfiche WebLink
Impact Topic and Impacts <br /> <br />EIR HITIGATION MEASUR~-S <br /> <br />Project Impact Summary (cont) <br /> <br />Mitigation Measures <br /> <br />Leve~' of impact <br />After Mitigation <br /> <br />-Solid Waste <br /> <br />· Demolition of existing site structures would result in a short- <br />term increase in the amount of solid waste that would be <br />generated on-site, <br /> <br />· Operation of the proposed project would result in a long-term <br />increase in the amount of solid waste that would be generated <br />on the project site. Specifically, an additionsl 14,341,800 lbs <br />per year would be disposed of at Bee Canyon Landfill. <br /> <br />Public Services <br /> <br />-Fire Protection <br /> <br />· Construction of the proposed project would significantly impact <br />the 'City Fire Department as increased demands would be placed <br />on Fire Department inspectors [and Plan Checkers]. <br /> <br />· None required. <br /> <br />· Trash separation and recycling programs shall be encouraged <br />on-site to decrease the amount of solid waste that would be <br />generated by the proposed projecL - (Recommended as Part <br />of this EIR. <br /> <br />· Prior to disposing of construction debris that would be <br />generated by removal of existing site structure, it shall be <br />checked to the satisfaction of the City for the presence of asbestos. <br /> <br />· Fair share funding shall be provided by this applicant for the <br />provision of additional personnel to enhance the Fire Departments <br />ability to provide plan check and site inspection services, <br />· [As an option to the above,] the applicant ~ [could] employ, [or <br />provide the City with funds for,] an on-site Deputy Fire Inspector <br />for all required fire inspections during construction [and could fund <br />a Fire Department Plan Checker, <br /> <br />Not Significant <br /> <br />Not Significanl <br /> <br />Not Significant <br /> <br /> <br />