Laserfiche WebLink
464 <br /> <br />San~a <br /> <br />l) <br /> <br />2) <br /> <br />3) <br /> <br />s) <br /> <br />6) <br /> <br />?) <br /> <br /> Ana Boulevard <br /> <br />Remove a'll existing street curb, gutter, <br /> 'n <br />pavl g to centerline, sidewalk, trees, etc. <br />and construct new street paving from <br />centerline to new curb and gutter at 44 feet <br />from centerline. <br />Construct new full width sidewalk with tree <br />wells. <br />Construct new driveways in accordance with <br />approved plans. <br />Furnish ornamental street lights with <br />underground service as directed by City <br />Engineer. <br />Plant (8) 24-inch minimum box trees in 8 <br />tree wells at approved locations. <br />Relocate any interfering utilities per <br />approved improvement plan. <br /> <br />Install "No Stopping Anytime" Zone. <br /> <br />Third <br /> <br />l) <br /> <br />z) <br /> <br />s) <br /> <br /> Street <br /> <br />Remove street paving from centerline to <br />curb, existing curb, walk, driveways, and <br />any interfering utility. <br />Construct new street paving to new curb and <br /> from centerline with new <br />gutter at 20 feet <br />sidewalk per site plan. <br />Remove all trees and plant 12 new 24-inch <br />box trees at locations per approved plan. <br />Furnish ornamental street lighting with <br />underground service as directed by City <br />Engineer. <br />Construct any approved driveways per City <br />Standard #1112 from approved plans. <br /> <br />-4- <br /> <br /> <br />