Laserfiche WebLink
<br />v <br /> <br />ORDINANCE NO. <br />126 <br /> <br />NS-2107 <br /> <br />2. <br /> <br />Dedicate the new Fruit Street <br />approved improvement plans. <br /> <br />cul-de-sac <br /> <br />per <br /> <br />3. Dedicate Grand Avenue for a width of 50' from <br />street centerline to property line. <br /> <br />4. <br /> <br />exclusive underground, non-exclusive <br />eaaements and traffic signal easements, to <br />of Santa Ana per approved plans. <br /> <br />Dedicate <br />surface <br />the City <br /> <br />5. Submit documentation assuring that the disposition <br />of access to the residential properties on Linwood <br />and Eastside Avenues has been completed. <br /> <br />B. Prior to issuance of a utility release, complete the <br />following: <br /> <br />1. Improve Fruit Street as follows: <br /> <br />a) Construct cul-de-sac per approved improvement <br />plan. <br /> <br />b) Construct two driveways per City Standard <br />#1112, Case 2, (W=32', A-40', and X-4'). <br /> <br />c) Install "No Stopping Anytime" Zone. <br /> <br />d) <br /> <br />Furnish ornamental <br />underground service <br />Engineer. <br /> <br />street lighting with <br />as directed by the City <br /> <br />e) <br /> <br />Construct street tree wells <br />size 24 inch box trees <br />#1124 at locations in <br />approved improvement plans. <br /> <br />and plant minimum <br />per City Standard <br />accordance with <br /> <br />f) <br /> <br />signage and striping per approved <br /> <br />Install <br />plans. <br /> <br />g) Relocate utilities per approved plans. <br /> <br />h) Construct storm drain catch basins at end of <br />existing 78 inch storm drain. <br /> <br />2. Improve Eastside Avenue as follows: <br /> <br />Construct cul-de-sac <br />plan. The location of <br />based on the timing <br />widening project. <br /> <br />per approved improvement <br />this cul-de-sac will be <br />of the Route 5 Freeway <br /> <br />6 <br /> <br />II <br />