Laserfiche WebLink
<br />ORDINANCE NO. NS-2107 <br /> <br />3. <br /> <br />Improve the Sixth <br />intersection as follows: <br /> <br />Street/McClay <br /> <br />Street <br /> <br />a) Construct curb, gutter, sidewalk and pavement <br />per improvement plans. <br /> <br />b) <br /> <br />approved <br /> <br />Install signage and striping per <br />plans. <br /> <br />c) <br /> <br />street lighting with <br />as directed by the City <br /> <br />Furnish ornamental <br />underground service <br />Engineer. <br /> <br />d) <br /> <br />and plant minimum <br />per City Standard <br />accordance with <br /> <br />Construct street tree wells <br />size 24 inch box trees <br />#1124 at locations in <br />approved improvement plans. <br /> <br />e) Relocate utilities per approved plan. <br /> <br />4. Improve Grand Avenue as follows: <br /> <br />a) <br /> <br />City <br />and <br /> <br />southerly <br />Case 2, <br /> <br />driveway per <br />(W=25', A=33', <br /> <br />Construct new <br />Standard Ill1l2, <br />X=4'). <br /> <br />b) Construct new driveway, north of the proposed <br />parking structure per City Standard #1112, <br />Case 2, (W-40', A=48', and X-4'). <br /> <br />c) Construct new curb, gutter, sidewalk and <br />pavement at 42' easement of street centerline <br />on Grand Avenue, south of the proposed <br />parking structure. <br /> <br />d) Construct new traffic signal system at the <br />intersection of vacated Sixth Street and <br />Grand Avenue per approved improvement plans. <br /> <br />e) Remove and replace existing, broken pavement. <br /> <br />f) Relocate behind the new curb, the most <br />southerly Grand Avenue fire hydrant. <br /> <br />g) Install "No Stopping Anytime" zone. <br /> <br />h) <br /> <br />and plant minimum <br />per City Standard <br />accordance with <br /> <br />Construct street tree wells <br />size 24 inch box trees <br />#1124 at locations in <br />approved improvement plans. <br /> <br />7 <br /> <br />~ <br /> <br />127 <br /> <br />I, <br />