My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2385
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1999 (NS-2379 - NS-2415)
>
NS-2385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:02:06 PM
Creation date
6/26/2003 10:08:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2385
Date
5/17/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Submit Final Design of off-site Storm <br />Drain and obtain review and approval by <br />the City and the City of Costa Mesa. <br />Final design must conform to Storm <br />Drain Locational Plan. <br /> <br />Prior to issuance of Building Permit for Phase I <br />building, as set forth in developer's plans submitted <br />in connection with GPA No. 98-04, AA No. 98-11, <br />and related negative declaration. <br /> <br />2. Install off-site storm drain system <br />from Sunflower to the Owner's property <br />line along Harbor Boulevard as set forth <br />in the Final Design. <br /> <br />Prior to City's issuance of Certificate of Use and <br />Occupancy for Phase I building, or six (6) years <br />from the effective date of this Agreement, <br />whichever comes fa:st. <br /> <br /> After the effective date of this Ag~.eement, Owner shall promPily and diligently ' ' ' <br />· - malte ~ood faith efforts to secure afl n[c.essary permits, variances and approvals necessary tO - -" <br /> ' pursue to completion the facilities set forth in the Final Design of the Storm Drain Locational Piafi <br /> and the development therefor as provided in this Agreement, including without limitation all <br /> permits from the City of Costa Mesa. With respect to the Final Design, Owner shall complete all <br /> construction and development, shall submit all plans, drawings, and other documents, and perform <br /> all of its obligations under this Agreement within the times specified above. During periods of <br /> construction of the off-site storm drain egcompassed in the Storm Drain Locational Plan, Owner <br /> shall submit to the City a written report of the progress of the construction when and as <br /> reasonably requested by the City. The report shall be in such form and detail as may be <br /> reasonably required by the City, and shall include a reasonable number of construction <br /> photographs (if requested) taken from the last report by Owner. Development scheduling or date <br /> or times of performance may be subject to revision from time to time if fzrst mutually agreed to in <br /> writing. Such revisions do not constitute amendments requiring further notice and public hearing. <br /> <br /> Notwithstanding the fo?egoing, for a twelve (12) month period following the <br />effective date of this restated and amended Agreement as set forth in Section 1.6 above,, Owner <br />shall have the un/lateral right to inform the City in writing that it is canceling this Agreement on <br />the sole grounds that it has chosen to not proceed with the Project. This twelve (12) month <br />period within which the Owner may cancel this Agreement may be extended for an additional six <br />(6) months upon Owner's written request coupled with the written approval of this request by the <br />Executix;e Director of the City's Public .Works Ag.ency. Should Owner exercise its right to cancel. <br />this Agreement during this twelve (12) month period'or'an3/six (6) niohth extehsion, neither · <br />Owner nor City shall have any rights or obligations hereunder. After this twelve (12) monih <br />period, together with any six (6) month extension, Owner's obligations hereunder may only be <br />waived or amended pursuant to the provisions of Section 9.2 of this Agreement. <br /> <br /> 5.9 Responsibility For Costs of Off-Site Storm Drain. The City and Owner <br />agree that Owner shall be responsible for all costs associated with the design and construction of <br />the off-site storm drain provided for in the Storm Drain Locational Plan. Upon acceptance of the <br />off-site storm drain, including but not limited to the catch basins, by the City and the City of Costa <br />Mesa, Owner's responsibility to pay all costs associated with the off-site storm drain shall cease. <br />Owner shall obtain at least three (3) bids from qualified bidders for the construction of the off-site <br />storm drain, which identifies all labor and construction costs associated with the Storm Drain <br />Locational Plan. These bids shall be submitted to the City and Owner shall award the contract to <br />construct the off-site storm drain to the bidder selected by the City. Owner's overall financial <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.