Laserfiche WebLink
47 <br /> <br />obligation shall be as follows: <br /> <br />Portion of off-site storm drain <br />between Lake Center Drive and <br />Owner's property (design and <br />construction) <br /> <br />100% of all costs <br /> <br />Portion of off-site storm drain <br />between Sunflower and <br />Lake Center Drive (design and <br />construction) <br /> <br />18% of all costs <br /> <br /> ~ .The City shall be responsible, to Owner to,r.eimburse the 82% of the overall cost of <br />'de~'~/i"find c. oristructioh'of the portioh of the'off-site stdrm between Sunflov/,er anqi'Lake.Center <br />Drive as set forth in section 5.10 below (hereafter "City's Share"). <br /> <br /> 5.10 Fee Deferral and Reimbursement. To reimburse Owner for Owner's .: <br />initial obligations to pay the entire cost associated with design and construction of the off-site <br />storm drain provided for in the Storm Drain Locational Plan, the parties agree that the following <br />fees, otherwise due and oweable by Owner, shall be deferred and not be paid by Owner as a <br />condition of obtaining any City permit or approval: <br /> <br />Fee Unit Fee Amount Total Deferred Fee <br /> (Estimated) <br />TSIA Fee (Area E) 80,000 SF $2,01/sf $160,800 <br />Sewer Connection 293 Plumbing $57.97/fixture $16,985 <br />Charge Fixtures <br />Water Main Charges 520 Linear Ft on $24.00/linear foot $ 28,104 <br /> Harbor <br /> 651 Linear Ft on <br /> MacArthur <br />TOTAL $205,889 (estimate) <br /> <br /> In addition, the parties agree that the City's reimbursement obligation shall be <br />credited by the City Drainage Assessment Fees (Area III) that Owner would otherwise be <br />required to pay, estimated to be $23,544, and that Owner shall not be required to pay this fee. <br />This sum, together with the $205,899 estimated fee deferral shall be referred to as the Offset <br />Amount. The exact amount of the Offset Amount shall he calculated by the City at the time that <br />Owner obtains a building permit for the Phase I building, using the then current rates of each fee <br />and the final Units of size. <br /> <br /> Within sixty (60) days of the date upon which the City accepts the off-site storm <br />drain, as set forth in the Storm Drain Locational Plan, into the City's storm drain system, City <br /> <br />9 <br /> <br /> <br />