Laserfiche WebLink
EXHI~,T E <br /> <br />EIR MITIGATION MEASURES <br /> <br />P,'oJoct ImpDct Summery (coal) <br /> <br />Impact Topic and Impacts <br /> <br />Mhlgatlon Measures <br /> <br />Level el Impacl <br />Allot Mitigation <br /> <br />.Water <br /> <br />, Project Implementallon would increase walor consumplion by <br />28,524 galtons p~r p~ak hour. Available supply is oslimalod <br />at 109,200 gallons I~r po~. hour. <br /> <br />· Tho Iollowing mitlgation measures are recommended in order to <br />reduce thls project's demand lot water. <br /> <br />· Tho appIicanl shall Insulate hot water lines In WalOr <br />rocirculatin9 systems <br /> <br />· Tho applicant shall inslall low walor use faucets in all structures <br /> <br />, The applicant shMl install Iow-flush IoiIels In ali slructures <br /> <br />. Tho applicanl shall ensure that all ddnkin9 Iountalns <br />on.site are filled wilh selbclosing valves. <br />· Tho applicant shall Incorporale drip.irrigation systems <br />on-silo lot landscape waloring whore approprlalo and Iow <br />wate'r consuming vegetation shall bo used on-silo where <br />possible. In addition all sprlnklorlng dovlcos shall be <br />Io reduce water wasle. Tho landscape Irrigalion Syslom <br />shall be'transferod lo a reclaimed water system when it <br />becomes available <br /> <br />, The applicant shall ensure that Iho water Syslnm has <br />adequate pre'-.curo Jot lbo proloction purposes. <br /> <br />Not Significanl <br /> <br /> <br />