Laserfiche WebLink
EXHIbiT E <br /> <br />EIR MITIGATION MEASURES <br /> <br />PtoJocl Impact Summsry {cent} <br /> <br />Impact Topic and lmpacls <br /> <br />Air Quality (Continued) <br /> <br />Miligalion Measures <br /> <br />. A Transportation Systems Management (TSM) Plan lot tho <br />proposed projocl shall bo developed by lbo applicant. <br /> <br />. Bicycl~ racks shall bo constructed on-sile lot u~,o by employees <br />and patrons. <br /> <br />' Improved Iransll lacililk~s on tho proJecl silo <br />shall bo constructed by the applicant. Such <br />lac~lhios shall include covered and lighted bus stops w;th turnout bays <br /> <br />, Sale padoslrian walks belwoen buildings and <br />bus slops shall bo conslruclod on-she by lbo appl[canl to encourage <br />Itans~i uso. <br />· Transporlafion improvomenls such ns road widening, slgnal <br />synchronization, Intersection widenings, etc. shall ~e <br />construclod by tho applcant as requbod by the City ol Santa Aaa. <br /> <br />· Car/van poofln§ program shall bo Implemented Ihrough <br />employment el a pormanon! On.silo poollng coordinalor <br /> <br />· Prolertod parking shall be provided In Iho parking <br />structure for Ihoso who uso tho pooling program. <br />Signage 1o thai aflocl shall bo Installed and malntainod <br />by Iho appficanl. <br /> <br />Level of Impact <br />Allot Mitigation <br /> <br /> <br />