Laserfiche WebLink
B×HI~T ~ <br /> <br />EIR MITIGATION MEASURES <br /> <br />Proioct Impact Summery (con't) <br /> <br />Impsct Topic and Impaols <br /> <br />· Storm Drainage (ConUnuod} <br /> <br />, Operation el tho proposed project Is oxpoclod to increase <br />Iho smount of ~lle runoll by a negligible amount (2.06 cls). <br /> <br />, Should any proiocl.genoraled sediment be deposilod in City <br />storm drains, the applicant shall fund any required clean.up Io <br />lbo mulual satlslactlon el the City and tho applicant. <br />. Exposed so~ls shall bo covered with soil binding malelal <br />(such as burlap and/or fas1 growing grasses) as soon as possible <br />to prevent sell eroslon during storms. <br /> <br />· The lollowing measures should ba implomenlod in order Io reduce <br />tho potential for impacls during ptoiect operation. <br /> <br />· The applicant shall prepare a storm dralnago plan and subm[I <br />it Io tho City Engineer lot review and approval. Such a <br />plan shall Idenfily 1he <br />proposed drainage <br /> <br />· Parking a,'oa maintenance and swooping shall bo conduclod <br />regularly (wilhout the uso el water) to reduce tho amount <br />poltuiants enlerlng the City dralnage syslem. <br /> <br />Luvol el Impacl <br />Alter I, Ai11oatlon <br /> <br />Not Signilicanl <br /> <br /> <br />