My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922
Clerk
>
Minutes
>
CITY COUNCIL
>
1886-1951
>
1922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:29:21 PM
Creation date
4/9/2003 2:45:07 PM
Metadata
Fields
Template:
Pre-Charter
Year
1922
Pre-Charter - Doc Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Item 1 Item 2 Item 3 <br /> <br />B.R.Ford .22~ .40 <br />Geo.H. Oewald .2V <br />T.W.Oglesby .24 .50 <br />Wells & Bressler.24~ .50 <br /> <br /> .40 <br />1.00 <br /> .80 <br /> .80 <br /> <br />Bids were received as follows: <br /> <br /> Item 1. The regrading to a sub-grade and the lay- <br />ing of a six (8) inch concrete pavement with belt- <br />finish wearing surface, complete with the furnishing <br />of all necessary equipment and material on an <br />of 185,352.5 square feet. <br /> <br /> Item 2. The construction of concrete curb complete <br />with furnishing of ail necessar? equipment and mate <br />on an estimate of 3,~28 linear feet. <br /> <br /> Item 3. ~A~e trenching, furnishing and laying of <br />seventy-four (V4) four (4) inc~house branch sewers <br />from the main sewer to th~ curb line complete with <br />fu~nishlng af all necessary equipment and material on <br />an estimate of 18A5 linear feet. <br /> <br /> Item 4. 'l~e trenching, ful~nishing and laying of <br />seven (V) six (8) inch stub end main sewers complete <br />with the furnishing of all the necesaar~ equipment <br />and material and the back filling of trench on an es- <br />timate of 210 linear feet. <br /> <br /> Item B. The trenching, furnishing and laying of one <br />(1) ten (10) inch stub end main sewer complete with <br />the furnishing of ell the necessary equipment end <br />material, and t~e back filling of trench on an esti- <br />mate of ~1 linear feet. <br /> <br /> Item 8. The construction of concrete combination <br />curb and~mtter complete with tbs furnishing of all <br />necessary equipment end material, according to plan~ <br />and specifications on an estimate of A820 linear feet <br /> <br /> Item V. The construction of a special twenty inch <br /> <br />curb complete with furnishing of all necessary equip-~ <br /> material according to plans and specifics- <br /> an estimate of 2V8 linear feet. <br /> <br />merit and <br />tions on <br />Item 4 <br /> <br /> .60 <br /> 1.50 <br /> .V5 <br /> 1.00 <br /> <br />~he Board <br /> <br />Item 5 Item 6 Item V Totals <br /> <br />1.00 1.95 .55 $53,769.V4 <br />2.00 2.25 .V5 64,8~3.60 <br />.90 2.00 .V5 5V,043.80 <br />2.00 1.~5 .65 56,813.~6 <br /> <br /> of Trustees thereupon rejected all bids ex. <br />cept the bid hereinafter mentioned, and awarded the <br />contract to B. R. Ford for the work or improvement as <br />the lowest responsible bidder therefor at the price <br />named in his bid. <br /> <br /> Trustee W.A.Greenleaf then introduced a resolution <br />awarding the contract to B. R. Ford. The resolution <br />was .~red filed, read, considered and designated <br />Resolution of Award No. 853. l~e roll was called and <br /> <br />the resolution passed by the vote of the following <br /> <br />named members of the Board of Trustees. <br /> Ayes: Trustees J.W. Tubbs, C.H. Chapman, <br /> · ~.frreenleaf, John O. Mitchell. <br /> Noes: ~A'astees <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.