Laserfiche WebLink
In Re <br /> <br />Bush St. <br /> <br />E. & W. 20th St. <br /> <br />E. Santa Olara. <br /> <br />This being the time and place fixed for the opening of btd~ <br /> <br />or proposals for the ~ rk ordered done and improvement <br /> <br />ordered made upon and alOnE a portion, of those open public <br /> <br />streets in the city of Santa Asa commonly known as Bush <br /> <br />Street, East and West Twentieth Streets and East Santa <br /> <br />Clara Avenue, briefly described in.~aso~ution of Intention <br /> <br />No. 914, and ordered done in reaolution No. 951. And the <br /> <br />Board of ~rustees being duly oonwened in open session pro- <br /> <br />seeded to and did publicly open, examine, and declare all <br /> <br />bids received. Bids were r~oeived as follows: <br /> <br /> Item 1. The regrading o~.Bush Street to a subgrad¢ <br />and the laying of six (8) inch asphaltic concrete pave- <br />ment in accordance with plans and apeoi~ioations com- <br />plete with the furnishing of all..neee.ssar~ equipment, <br />labor and material, on an estimate of 120,862 square <br />feet. <br /> <br /> Item 2. The regrading of. East Santa Clam Avenue <br />to a subgrade and the laying.of~ six ..(6.) inch asphaltic <br />concrete pavement in acoordan~e.w[th.~lans and specifi- <br />cations complete with the furnishing of all necessary <br />equipment, labor and material, on .an estimate of 10,502 <br />square feet. <br /> <br /> Item 5. The regrading of East and West Twentieth <br />Streets to a subgrade and the laying of five (5) ~nshes <br />of asphaltic concrete pavement inaooordance with plans <br />and speoifioatlons complete with the fuA-nishing of all <br />neoessar~ equipment, .labor and material on an estimate <br />of 42,140 square feet. <br /> <br /> Itm 4. '£he oonstruotlon of concrete curb on <br />Bush Street, East and West Twentieth. Streets and East <br />Santa Clara Avenue complete withthe, ftumishing of stl~- <br />necessary equipment, labor and material..on an estimate <br />of 2,0~5 linear feet. <br /> <br /> Item 5. The trenching, furnishing and laying of <br />six (6) inch main sewer pipe on East,and West Twentieth <br />Streets and East Santa Clara Avenue .in accordance with <br />plans and specifications complete with ~he. furnishing <br />of all necessary equipment, labor and material on an <br />estikate of 4~ linear feet. <br /> <br /> Item 6. The t~enehing, fuxmishing and laying of <br />forty-seven (4V) four (4) inch house, b~anoh.oonnesting <br />sewers f~om tbs main sewer to and inside of curb line <br />complete with the furnishing of all neoeeaar? equipment, <br />labor and material on an estimate of 804 linear feet. <br /> <br /> Ite~ V. ~he excavation fo~ and the construction of <br />one flush tank on East Twentieth Stneet .so.shown on plans <br />complete with the fu~nishing of all necessary equipment, <br />labor and material. <br /> <br /> Item 8. The excavation for and the eonst~uetion of <br />one (1) lamphole on East Santa. Clara Avenue as shown on <br />plans $~e~e with the furnishing of all neoessal-y equip <br />ment, labor and material. <br /> <br /> Item g. 'i'he excavation for and the construction of <br />one (1) ~einfo~ed eonsrete box ~ulvert on Bush Street as <br />shown ~n plans oo~lete with the ~u~nishing of all <br />neoee~al, y equi~a~ent, labor and material. <br /> <br />Bidder Item 1. Item 2. Item 5. <br /> <br />Geo. R. Curtis .26 .26 .25 <br />Steele Flnle~ .215 .22 .195 <br /> <br />Item4. Item 5. Item 6 Xtem ?. Xtem 8. Item 9. <br /> <br />.es 1.os .?s $2oo.oo $1o.oo Seco.os <br /> <br />.50 cVS .50. 150.00.. .15.00~ 400.00 <br /> <br />T~ B~ of T~uatees thereupon rejected all bids <br /> <br />except t~ bid hereinafter me~ttoaed and awarded the son- <br /> <br />t~aot to Steele Finle~ for the work or irmprovement as the <br /> <br />lowest ~elpoq~ble bidder therefor at. the price named in <br /> <br />his bid. <br /> <br /> <br />