Laserfiche WebLink
~teele Finl~ y <br />Ge'o. R. Curtis <br /> <br /> In Re <br /> <br />Resolution of Award <br />'No. 11~8 - S~ur~eon <br />1Vth to 20th. <br /> <br />St. <br /> <br />~teele Finley <br />O~leaby & D~hl <br />.Wells & Bresaler <br /> <br />merit, labor and material on an estimate of 108,213 square <br />feet. <br /> <br /> Item 2. The trenching, furnishing and laying of <br />seventy-two (V2) four (4) inch house branch sewers from <br />the main sewer to the curb line complete with the furnish. <br />lng of ,11 necessar~ equipment and material, on an esti- <br />mate of 1512 linear feet. <br /> <br /> Item 3. The construction of concrete curb complete <br />with furnishing of all necessar~ equipment and material <br />on an estimate of 38V0 linear feet, <br /> <br />Item 1 Item 2 Item 3 <br /> <br />The Board of Trustees thereupon rejected all bids <br />e~cept the bid hereinafter mentioned and awarded the <br />contract to Steele Finley for the work or improvement as <br />the lowest responsible bidder therefor, at the price <br />named in his bid. <br /> <br /> Trustee Chapman then introduced a resolution awarding <br />tbs contract to Steele Finley. 'l~e reaol,tion was orders <br />flied, read, considered, designated Resolution of Award <br />No. llSV and passed by the following vote: <br /> <br /> Ayes: Trustees C.H.Chapman, Geo. McPhee, <br /> Nat H. Neff, J. W. Tubbs. <br /> <br /> Noes: Trustees None. <br /> <br /> Absent: Trustee C. L. Killen. <br /> <br />This being the time and place fixed for the opening of <br />bids or proposals for th~ work ordered done s nd improve- <br />ment ordered made upon and along a portion of <br /> <br />Street, briefly d~scrlbed in Resolution of Intention No. <br />1125: and the Board of Trustees being duly convened in <br />open session proceeded ~o and did publicly o~en, <br />examine and declare all bids received. Bids were receive~ <br />~s follows: <br /> <br /> Item 1. The regrading to a subpgrsde and t~e laying of <br />five (5) inch concrete pavement with belt finish wearln <br />surface, complete with the furnishing of all necessary <br />equipment and material, on an estimate of ~8,S80 square <br />feet. <br /> <br /> Item 2. Xhe construction of concrete curb complete <br />w~th the furnishing of all necessary equipment, la'or <br />and material on an estimate of 114 lin. feet. <br /> <br /> Item 3. The trenching, furnishing an4 laying of four <br />(4) four (4) inch house br~nch sewers from the ~ain sewer <br />to the curb line complete with the furnishing of <br />necessary equipment, labor and materi,1 on an estimate <br /> <br />of 84 linear feet'. <br />Item 1 Item 2 Item 3. <br /> 6o ' 6o ' <br />.221 50~'/, 50W <br /> <br />The Board of Trustees thereupon rejected all bids <br />except the bid hereinafter mentioned ,nd awarded the <br />contract to Oglesby and Dahl for the work or improvement <br />as the lowest responsible bidder therefor, at tbs price <br />named in their bid. <br /> <br /> <br />