Laserfiche WebLink
In Re <br /> <br />Resolution of Award <br /> <br />Ne. 1747 - So. Main Street. <br /> <br />This bein~- the time and place set forth For the opening <br /> <br />of bids or proposals for the improvement of a portion of <br /> <br />So. Msln Street, ss briefly described in Resolution of <br /> <br />Intention No. 1729, and the Board of Trustees being duly <br /> <br />convened in open session, proceeded to open, examlne and <br /> <br />declare all bids received as follows: <br /> <br />Item 1. The grading to a subgrade and the laying thereon <br />of eight (8) inch Portland Cement Concrete Paverr~ent, com- <br />plete with the furnishing of all necessary equipment, <br />labo~ and m~erial for the s~m of $ per sq. ft. <br />Item 2. The grading to a subgrade Jnd the laying thereon <br />of a five (5) inch Portland Cement Concrete Pavement, <br />plate with the furnishing of all necesssry equipment, <br />i~bor and material for the sum of 5' per sq. ft. <br />Item 3. The' excavation for ~nd the construction of <br />Concrete Curbs, complete with the furnishing of all <br />sary equipment, labor and m~terlal for the sum of ~ <br />I)e~ linear foot. <br />Iter~ 4. The excavation for and the construction o~ <br />Concrete Sidewalks, having a total thickness of three and <br />one-half (3~) inches, complete with the furnishing of all <br />~}eceaaary equipment, labor and material for the sum of <br /> per sq. ft. <br />Item 5. The trenching, furnishing and laying of elght (8 <br />inch diameter main sewer, complete with the furnishing of <br />all necessary equipment, labor and material for the sum <br />o~ $ per linear foot. <br />Item 6. The trenching, furn~shlng and laying of four (4) <br />inch diameter house connecting sewer laterals, complete <br />with the h~rnlshing of all necessary equipment, labor and <br />material for the sum of ~~er linear foot. <br />Item 7. The excavation ~or ~nd the Construction o~ one <br />reln~orced concrete culvert complete with the furnishing <br />of all race,sari equipment, labor ~nd material for the su~ <br />of $ complete. <br />Ytem-~ fu~nishlng and installation of an Ornamental <br />Li~htIng System consisting of One Hundred and Ten (llO) <br />King No. KOI?i Double Lighting Standards, equipped with <br />Oeneral Electric Form No. 12 Ornamental Novalux Units In- <br />c]ud!ng 250 candlepower 6.6 ampere lamps with No. 124 <br />Globes and No. 1124 Canopy medium alabaster rippled glass <br />ware complete with all necessary concrete foundations, <br />anchor bolts pothead~ wiring, conduits, cables and other <br />necessary equipment, and items, complete with the furnish- <br />ing of ~11 necessary ~qu~pment, labor and material for <br />the sum of~. . <br /> <br /> Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 <br />Pearson & Dickerson $~.283 $0.20 $0.50 50.16 $1.00 $1.00 <br />~. Blumenkranz 0.279 0.19 0.50 0.16 1.50 0.70 <br />Joseph M.Shull & Co. 0.28 0.25 0.57 O.lV ].50 0.90 <br />~e!ls & Bressler 0.27~ 0.19 0.70 0.16 1.50 0.60 <br />Griffith Company 0.26 0.18 0.48 0.15 0.75 0.50 <br /> <br />In Re <br /> <br />Resolution Ordering Work <br /> <br />Re. 1748 - E. Washington Ave. <br /> <br />Item 7 Item 8 <br />$1100.00 $40,000.00 <br />650.00 39,500.00 <br />8~0.00 42,500.00 <br />1000.00 38,500.00 <br />850.00 40,000.00 <br /> <br />On motion of Trustee Goods, seconded by Collier, and car- <br /> <br />rted, the bids were referred to the City Engineer for <br /> <br />checking to report back at this meeting. Following the <br /> <br />report, the Board of Trustees awarded the contract to <br /> <br />Grif~ith Company as the lowest responsible bidders there- <br /> <br />for at the price named in their bid. <br /> <br />Trustee Chapman introduced a resolution awarding the con- <br /> <br />tract to Griffith Company. The resolution was.ordered <br /> <br />filed, read, considered, designated Resolution No. 1747 <br /> <br />and passed by the following vote: <br /> <br />Ayes, <br /> <br />Trustees C.H.Chapman, Gee McPhee, E.B. Collier. <br /> Stanley E. Goods, F.L.Purinton. <br /> <br />Noes, Trustees None. <br /> <br />Absent, Trustees None. <br /> <br />This being the day and hour set for the hearing of pro- <br />tests against the improvement of East Washington .~venue, <br /> <br />as set out in Resolution of Intention No. 17~, and the <br /> <br />Board of Trustees being now in regular session, proceeded <br /> <br /> <br />