Laserfiche WebLink
382 <br /> <br />In Re <br /> <br />Rase. No. 2060 <br /> <br />Intention--Third, <br /> <br />Birch and Fourth Sts. <br /> <br />A resolution was introduced declaring it to be the in- <br />tention of the City Council to order the installation <br />and construction of an ornamental lighting system on <br />portions of Third Street, Birch Street, and Fourth <br />Street. The resolution was ordered filed, read, con- <br />sidered, designated Resolution of Intention No. 2060 <br />and passed by the following vote: <br /> <br /> Ayes, Trustees J.L. McBride, W.J. Kelly, Stanley E. <br /> <br /> Noes, <br /> <br />Abs ant, <br /> <br /> Goode, F.L. Purtnton, <br /> <br />Trustees None. <br /> <br />Trustees Homer C. Chaney. <br /> <br />In Re <br /> <br />Rase. No. 2061 <br /> <br />Award--Pine & Cedar Sts. <br /> <br />This being the time and place fixed fo~ the opening of <br /> <br />bids or proposals for the work ordered done and improve. <br /> <br />ment made upon Pine Street between Cedar and Minnie <br /> <br />Street and a Portion of Cedar Street, as briefly des- <br /> <br />cribed in Resolution of Intention No. 2051, and the <br /> <br />City Council being duly convened in open session pro- <br /> <br />ceeded to and did publicly open, examine and declare <br /> <br />all bids received as follows: <br /> <br />Item No. 1. The grading to a Subgrade and the laying <br />thereon of a five (5) inch Portland Cement Concrete <br />Pavement, complete with the furnishing of all necessary <br />equipment, labor and material for the sum of <br />per square foot. <br />Item No. 2. The excavation for and the construction <br />of PortlandCement Concrete curbs, complete with the <br />furnishing of all necessary equipment, labor and mater- <br />ials for the sum of $ per linear foot. <br />Item No. 5. The excavation for and the construction of <br />Portland Cement Concrete sidewalks, having a total <br />thickness of three and cna'half (5~) inches, complete <br />with the furnishing of all necessary equipment, labor <br />and material for the sum of $ per square foot; <br />Item No. 4. The excavation for a~e construction <br />of Portland Cement Concrete sidewalks, having a total <br />thickness of five (§) inches, complete with the furnish- <br />ing of all necessary equipment, labor and material for <br />the sum of $ per square foot. <br />Item No. 5. -T~nching, furnishing and laying of <br />four (A) i~n~ diameter salt glazed vitrified clay pipe <br />house connecting sewer laterals complete with the fur- <br />nishing of all necessary equipment, labor and material <br />for the sum of $ per linear foot. <br />Item No. 6. The excavation for and the construction of <br />standard concrete sewer manhole complete with the fur- <br />nishing of all ~ecessary equipment, labor and material <br />for the sum of $ .... complete. <br />Item No. 7. The trenchihg, furnishing and laying of <br />three quarter (~) inch diameter copper pipe house ser- <br />vice connections complete with the furnishing of all <br />necessary corporation cocks, curb cocks, lead connec- <br />tions and fittings complete with the furnishing of all <br />necessary equipment, labor and material for the sum of <br />i each. <br /> tam No. 8. The trenching, furnishing and laying of <br />three quarter ({) inch diameter Byers wrought iron gas <br />house connecting services together with all cocks, fit- <br />tings and necessary appurtenances thereto, complete <br />with the furnishing of all necessary equipment, labor <br />and material for the st~m of $ each. <br /> <br />Steele Finley <br />Griffith Company <br />Edward W. Dahl <br /> <br /> Total <br /> <br />7~OV.SO <br />8606.A0 <br /> <br />On motion of Trustee Goode!~ seconded by Kelly and car- <br /> <br />tied, the bids were referred to the City Manager and <br /> <br />Engineer for checking and to report ba~k at this meeti~ <br /> <br />Following the report, the City Council awarded the con- <br /> <br />tract to the Griffith Company as the lowest responsible <br /> <br /> <br />