Laserfiche WebLink
In Re <br />Bids <br />Improve Pomona St. <br />from Broadway to <br />Main St. <br /> <br />In Re <br />Bids <br />Storm sewer on <br />Delhi Road btn <br />Main & Rousselle <br /> <br />Sts. <br /> <br />Bid of Sully Miller Contracting Company: <br /> <br />Item <br /> <br /> 2 <br /> <br /> 6B <br /> 7 <br /> <br />Certified check <br /> <br />Unit Price <br />$ 1.00 <br /> <br /> Total <br /> S T0~.00 <br />o.21 1247.~o <br />1.6o 152o.0o <br />20.00 110.00 <br />3.80 4218.00 <br /> 3.80 220 0 <br /> 0.15 160180 $ 8476.60 <br />in the amount of $1100.00 accompanied bid. <br /> <br />Grand Total <br /> <br />Bid of Cox Bros. Construction Co.: <br />Item Unit Price Total <br />-l-- '$ 0.9~ $ -e)'~.oo <br />2 0.30 1782.00 <br />1 1.5o 1425.oo <br /> 24.00 132.00 <br /> 3812.00 <br />6A ~no bid <br />6B 20.00 1380.00 <br />7 0.21 225.12 <br /> <br />Grand Total <br /> <br />$ 9706.12 <br /> <br />Bond in the amount of ten per cent of amount bid accompanied bid. <br />On motion of Trustee Reed, seconded by Chandler and carried, bids <br /> <br />were referred to committee for checking and to report back. <br /> <br />Chairman appointed Asst. Engineer and Auditor, as committee. <br /> <br />On motion of Trustee Reed, seconded by Chandler and carried, the <br /> <br />Clerk was authorized to open bids covering improvement of Pomona <br /> <br />St. from Broadway to Main Streets, as follows: <br /> <br />Bid of ~Sully-Miller Contracting Company: <br /> <br />Item Unit Price Total <br /> <br />I $ 1.2o $ 828.oo <br />2 1.85 lO26.75 <br /> A 25 · 00 46 · 25 <br /> o.15 58.8o <br /> 3.7o 1457 · 80 <br /> <br /> 3.70 77.70 <br /> 6B .... <br /> <br />Grand Total <br /> <br />$ 3495.30 <br /> <br />Certified check in the amount of $500.00 accompanied bid. <br /> <br />Bid of Cox Bros. Construction Company: <br /> <br />Item <br /> <br />Unit Price <br /> <br /> .To.,t al <br /> <br />I $ 0.95 $ 655.5o <br />2 2.05 1137.75 <br /> 24.00 ~4.4o <br /> 0.21 U2.32 <br /> A no bid <br /> .oo 1352.oo <br /> no bid <br />6B 20.00 520 o00 <br /> <br />Grand Total <br /> <br />$ 3791.97 <br /> <br />Bond in the amount of ten per cent of amount bid accompanied bid. <br /> <br />On motion of Trustee Reed, seconded by Chandler and carried, bids <br /> <br />were referred to committee for checking and to report back. <br /> <br />Chairman appointed Asst. Engineer and Auditor, as committee. <br /> <br />On motion of Trustee Reed, seconded by Chandler and carried, the <br /> <br />Clerk was authorized to open bids covering the construction of a <br /> <br />storm sewer on Delhi Road between Main and Rousselle Streets, as <br /> <br />follows: <br /> <br />Bid of Milosevich and Zarubica Construction Company: <br /> <br />Item Unit Price Total <br />i $ 35'.oo $ 4T~51~o <br />2 22.00 8470.00 <br />3 22.00 20174.00 <br /> <br />Grand Total <br /> <br /> <br />