Laserfiche WebLink
In Re <br />Bide <br />Pullingtr~ee, <br />Prentice. Park <br /> <br />In Re <br />Bide <br />Transformers <br /> <br />Bid ef Mission Pipe'& Supply Co.: <br />9551 3" standard galvanized steel pipe 66.35c ft. <br />620' 2" standard galvanized steel pipe 32.27o ft. <br />2255' 1# standard galvanized steel pipe 15.07c ft. <br /> <br />,~ertified. check in the amount of $117.35 accompanied <br /> <br />$ 633.64 <br /> 200.07 <br /> <br />bid. <br /> <br />Bid cf Grinnell Company: <br />955 ft. 3' std. galv. steel pipe T&C 77.47 c ft. <br />620 ft. 2" " " " " 37.68 O ft. <br />2255 ft. 1" " " " " 17.61 c ft. <br /> <br />Certified check in the amount of~ $150.00 accompanied <br /> <br />$ 739.84 <br /> 233.62 <br /> 397.11 <br />$1370.57 <br />bid. <br /> <br />Bid of Crane Company: <br />955 ft. 3" std. galvanized wrot. steel pipe <br /> threaded & coupled 78.06 c ft. <br />620 ft. 2# ditto 37.97 c ft. <br />2255 ft. 1" ditto 17.73 o ft. <br /> <br />Alternate bid: <br />755 ft. 3# std. black wrot. steel pipe <br /> threaded & coupled 6~.71 c ft. <br />2255 ft. 1" ditto 1~.55 c ft. <br /> <br />$ 745.47 <br /> 235.41 <br /> <br />$ 481.01 <br /> <br /> $ 809.11 <br />Money order in the amount of $138.00 accompanied bid. <br /> <br />Bid of Steel Products Supply Co. Inc.: <br />955 ft. 3" galvanized pipe T&C $78.05cextention $745.38.525 ~ <br />discount 12~% .21 <br />620 ft. 2u ga~.vanized pipe T&C $37.97c extention $235.41, <br /> dieoo~un~ 12~% $ 205.98 <br />2255 f~. 1" galvanized pipe T&C $17.73 c extention $399.81, <br /> discount 12~% ~ 4~ <br /> Total 1 <br /> Plus state sales tax 36.24 <br /> $ <br />Certified check in the amount of $124.43 accompanied bid. <br /> <br />On. motion of Trustee Reed, seconded by Chandler and carried, bids <br /> <br />were referred to committee for checking and to report back. <br />Chairman appointed park Superintendent, City Engineer and <br /> <br />Purchasing Agent, as committee. <br /> <br />On motion cf Trustee Reed, seconded by Chandler and carried, <br /> <br />the <br /> <br />Clerk was authorized to open bids covering labor and equipment <br /> <br />required to pull and dispose of from 900 to 1200 orange trees in <br /> <br />Prentice Park, ae follows: <br /> <br />Bid of A. E. Fowler & Sons~ <br /> Pull or haul the trees off of the property or burn them on <br /> the property for the sum of $3.00 per tree. <br />Check in the amount of $360.00 accompanied bid. <br /> <br />Bid of James P. Loving: <br />$2.50 per tree to furnish labor and equipment to pull and dispose <br />of 900 orange trees providing a permit is obtainable to burn all <br />brush and stumps on this location. <br />Alternate bid of additional fifty cents per tree to furnish the <br />necessary equipment and labor to pull and dispose of 900 trees, <br />and haul stump butts to a regular dump for disposal. <br />To pull and dispose of some 200 orange stumps, $2.00 per stump. <br />Bid bond in the amount of $275.00 accompanied bid. <br /> <br />On recommendation of the Park Superintendent and on motion of <br /> <br />Trustee Chandler, seconded by Martin and carried, bids were <br /> <br />rejected due to the fact that there is a large crop of oranges on <br />the trees and a savings of approximately $5000.00 to $7000.00 <br /> <br />would be made if trees were not removed at this time; Clerk to <br /> <br />notify bidders of reason why bids were rejected. <br /> <br />On motion of T~ustee Chandler, seconded by Martin and carried, the <br /> <br />Clerk was authorised to open~ bids covering furnishing of transform <br /> <br />as follows: <br /> <br />Bid of Gough Industries, Inc.: <br />3 - 50 EVA-General Electric Cat. #75G~37 or equal <br />bidding on Marcus Type SF $ 460.00 each; extension $1380.00 <br />Bond in the amount of $150.00 accompanied bid. <br /> <br />Bid of Earl S. Cond0n Company: <br />3 - New - 50 KVA, Gregory, Type GI, continuous duty <br />80 degree C rise, 2400/4160Y volts primary, with <br /> <br /> <br />