Laserfiche WebLink
furnishing of all necessary equipment, labor and material <br /> for the sum of Four Thousand One Hu~dred Twenty-five Dollars <br /> and no cents ($1.65) per linear foot. <br /> <br /> Item No. 6. Ths trenching, furnishing and lay- <br /> ing of eight (8) inch diameter concrete main sewer, complete <br /> with the furnishing of all necessary equipment, labor and <br /> material for the sum of Nine Thousand Three Hundred Six <br /> Dollars an8 Eighteen cents ($0.82) per linear foot. <br /> <br /> Item No. 7. The trenching, furnishing and lay- <br />ing of six (6) inch diameter main sewer, complete with the <br />furnishing of all necessary equipment, labor and material <br />for the sum of Fourteen Thousand Twenty-Three Dollars and <br />.Sixty-eight cents ($0.68) per linear foot. <br /> <br /> Item No. 8. The excavation for and the construct <br /> ion of one reinforced concrete structure according to <br /> detail No. i complete with the furnishing of all necessary <br /> equipment, labor and material for the sum of Forty-Nine <br /> Dollars and Sixty cents ($49.60) complete. <br /> <br /> Item No. 9. The excavation for and the con- <br />struction of one re~nforced concrete structure according to <br />detail No. 2 complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Forty-nine <br />Dollars and Sixty cents ($49.60) complete. <br /> <br /> Item No. 10. The excavation for and the con- <br />struction of one reinforced concrete structure according to <br />detail No. 3 complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Forty-Nine <br />Dollars and Sixty cents ($49.60) complete. <br /> <br /> Item No. ll. The excavation for and the con- <br />struction of one reinforced concrete structure accor~ng to <br />detail No. 4 complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Eighty-five <br />Dollars ($88.00) complete. <br /> <br /> Item No. 12. The excavation for and the con- <br />struction of one reinforced concrete structure according to <br />detail No. $ complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Eighty-five <br />Dollars ($8§.00) complete. <br /> <br /> Item No. 1S. The excavation for and the con- <br />struction of one reinforced concrete structure according <br />to detail No. 6 complete with the furnishing of all <br />necessary equipment, labor and material for the sum of <br />Eighty-five Dollars ($8~.00) complete. <br /> <br /> Item No. 1~. The excavation for and the con- <br />struction of one reinforced concrete structure according to <br />detail No. ? complete with the furnishing of sll necessary <br />equipment, labor an8 material for the sum of Eighty-five <br /> <br /> <br />