My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927 (#1716-1862)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1927 (#1716-1862)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:48:21 PM
Creation date
4/16/2003 3:26:55 PM
Metadata
Fields
Template:
Pre-Charter
Year
1927
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ollars ($88.00) complete. <br /> <br /> Item No. 15. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. 8 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Eighty-five Dollars ($88.00) complete. <br /> <br /> Item No. 16. The eEcavatic~ for and the construction of <br />one reinforced concrete structure according to detail No. 9 complete <br />with the furnishing of all necessary equipment, labor and material <br />for the sum of Eighty-five Dollars,($8§.O0) complete. <br /> <br /> Item No. 17. The e~cavation for and the construction of <br />one reinforced concrete structure according to detail No. l0 <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Eighty-five Dollarsl$88.O0) complete. <br /> <br /> Item No. 18. The excavation for and the construction of <br />one reinforced concrete structure according to detail No. ll <br />complete with the furnishing of all necessary equipment, labor and <br />material for the sum of Eighty-five Dollars ($88.00) complete. <br /> <br /> Item No. 19. The excavation for and the constE~ction of <br />one reinforced concrete structure according to detail No. 12 complet~ <br />with the furnishing of all necessary e~ipment, labor and material <br />for the sum of Eighty-five Dollars ($88.00) complete. <br /> <br /> Item No. 20. The excavation for and construction of <br /> concrete sewer manholes complete with all necessary equipment, labor <br /> and material for the sum of Seven Th~lsand, Six Hundred and Forty- <br /> seven ~ollars and Seventy-five cents ($74.28) complete. <br /> <br /> Item N~. 21. The excavation for and the construction of <br /> concrete sewer manholes equipped with Maddox Hand Flushers, complete <br /> with all necessary equipment, labor and material for the sum of <br /> <br />Five Hundred and Fifty-Nine Dollars and thirty-two <br />each. <br /> <br /> Item No. gE. The excavation for and the <br /> <br />cents ($93.~2) <br /> <br />construction of <br /> <br />concrete sewer flush tanks <br />labor and material for the <br />($141.60) each. <br /> <br />complete with all necessary equipment <br />sum of Seven Hundred and Eight Dollars <br /> <br /> Item No. 23. The excavation for and the construction of <br />concrete sewer lampholes complete with all necessary equipment, <br />labor and material for the sum of One Hundred and Sixty-two <br />Dollars ($18.00} each. <br /> <br /> Item No. 24. The trenching, furnishing and laying of <br />eight (8) inch cast iron class "C" water main, complete with all <br />necessary gate valves, plugs, fittings, concrete valve boxes with <br />cast iron frames and covers complete with the furnishing of all <br />necessary equipment, labor and material for the sum of Six Thousand <br />Eight Hundred and Eighty-Five Dollars and twelve cents complete. <br /> <br /> Item No. 25. Th~ trenching, furnishing and laying of <br />four (4) inch cast iron class "C" water main, complete with all <br /> <br />383 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.