Laserfiche WebLink
all as particularly indicated on and in,accordance with the plans and specifications <br />hereinafter mentioned. <br /> <br /> That Carob trees shall be planted in the parkway.upon and along the herein- <br />before described portion of Sycamore Street, at such locations and in such manner <br />as is particularly indicated on andin, accordance with the plans and specifications <br />hereinafter mentioned. <br /> <br /> Together with such other work or improvements as are noted on the plans or <br />specifications which shall be considered as incidental to the above described work <br />and improvements, and no additional compensation shall be allowed therefor. <br /> <br /> The work to be done as herein set forth shall include the furnishing of all <br />labor, equipment and materials necessary for or appurtenant to the construction and <br />completion of all work herein specified. <br /> <br /> RESOLVED, That the said City Council hereby reject all of said proposals or <br />bids except the next herein mentioned, and hereby awards the contract for doing s aid <br />work and improvement to the lowest responsible bidder, to-wit: Griffith Company, at <br />the price named in thei~ bid as follows, to-wit: <br /> <br /> Item No. 1. The grading to a subgrade and the laying thereon of a Portland <br />cement concrete pavement having a total thickness of five (8) inches, complete with <br />the furnishing of all necessary equipment, labor and material for the sum of Sixteen <br />and 9/10 cents ($0.169) per square foot. <br /> <br /> Item No. 2. The excavation for and the construction of Portland Cement <br />Concrete curbs, complete with. the furnishing of all necessary equipment, labor and <br />material for the sum of Forty five cents ($0.48) per linear foot. <br /> <br /> Item No. 3. The excavation for and the construction of Portland Cement <br />concrete sidewalks having a total thickness of three and one-half (3-1/25 inches, <br />complete with the furnishing of all necessary equipment, labor and material for the <br />sum of Fourteen and 1/2 cents ($0.148) per square foot. <br /> <br /> Item No. 4. The excavation for and the construction of Portland Cement <br />Concrete aid~walkshaving a total thickness of five (5) inches, complete with the <br />furnishing of all necessary equipment, labor and material for the sum of Twenty centl <br />($0.20) per square foot. <br /> <br /> Item No. 5. The trenching, furnishing and laying of six (6) inch diamete~ <br />vitrified clay pipe main sewer, complete with the furnishing of all necessary <br />equipment, labor and material for the sum of Sixth cents ($0.80) per linear foot. <br /> <br />vitrified <br />necessary <br />foot. <br /> <br />Item No. 6. The trenching, furnishing and laying of four (4) inch diameter <br />clay pipe house connecting sewers, complete with the furnishing of all <br />equipment, labor and material for the sum of Sixty cents ($0.60) per linear <br /> <br /> Item No. 7. The excavation for and the construction of Standard Concrete <br />manholes complete with the furnishing of all necessary equipment, labor and material <br />for the sum of Sixty-five Dollars ($65.00) each. <br /> <br /> Item No. 8. The excavation for and the construction of a Standard Concrete <br />Flushtank together with all necessary appurtenances thereto, complete with the fUrn- <br />ishing of all necessary equi~ent, labor and material for the sum of One Hundred <br />Ten and no/lO0 ($110.00) complete. <br /> <br /> Item No. 9. The trenching, furnishing and laying of four (4) inch diameter <br />cast iron pipe water main, together with all necessary valves, concrete valve boxes, <br />fittings ar~l other necessary appurtenances thereto, complete with the furnishing of all <br />necessary equipment, labor and material for the sum of One Dollar$$1.O0) per linear foot <br /> <br /> Item No. 10. The trenching, furnishing and laying of three-quarter (3/~ inch <br />diameter copper pipe house connecting water services, together with all corporation <br />cocks, curb cocks, fittings and necessary appurtenances thereto, complete with the <br />furnishing of al~ necessary equipment, labor and material for the sum of Fifteen <br />Dollars ($15.00) each. <br /> <br /> Item No. 11. The excavation for, the furnishing and the installation of a <br />Corey four (4) inch valve opening fire hydrant together with the valve, valve box, <br />pipe and other necessary appurtenances thereto, complete with the furnishing of all <br />necessax-y equipment, labor andmaterial for the sum of Ninety-five dollars ($98.00) <br />complete. <br /> <br /> Item No. 12. The trenching, furnishing and laying of three (3) inch diameter <br />Byers wrought iron pipe gas main complete with the furnishing of all necessary equip- <br />ment, labor and material for the sum of Seventy-five cents ($0.V5) per linear foot. <br /> <br /> Item No. 13. The trenching, furnishing and layifig of one and one-quarter <br />(1-1/4) inch diameter Byers wrought iron pipe house connecting Ss services together with <br />all cocks, fittings and necessary appurtenances thereto, complete with the furnishing <br />of all necessary equi~ent, labor and material for the sum of Fifteen dollars ($18.00) <br />each. <br /> <br /> Item No. 14. The removal and disposal of all existing trees or stumps within <br />the right of way, complete with the furnishing of all necessary equipment, labor, for <br />the sum of Three Dollars ($3.00) each. <br /> <br /> Item No. 15. The furnishing, excavation for and the planting of five (5) <br />gallon catch trees, together with all necessary supports and other appurtenances thereto <br />complete with the furnishing of all necessary equipment, labor and material for the <br /> <br /> <br />