246 <br /> <br /> RESOLVED: That the said Board of Trustees hereby rejects all of said <br /> propoaals or bids except that next herein mentioned, and here~y awards the contract <br /> for doing said work and improvement to the lowest responsible bidder, to-wit: <br /> Kovacevich and Price, Inc., at the unit prices named in their bid, as follows, <br /> to-wit: <br /> <br /> Item No. 1. The grading to a subgrade and the laying thereon of a Port- <br /> land Cement Concrete Pavement having a total thickness of Six (6) inches, complete <br /> with the furnishing of all necessary mquipment, labor and material for the mum of <br /> Nimeteen and 9/100 cents ($.199) per square foot. <br /> <br /> Item No. 2. The grading to a subgrade and the placing thereon of a <br /> Portland Cement Concrete Pavement having a total thickness of five (6) inches, <br /> complete with the furnishing of all necessary equipment, labor and material for the <br /> sum of Nineteen cents (~.15) per square foot. <br /> <br /> Item No. 3. Tho grading for and the preparation only of a subgrade <br /> <br /> where re<~uired, for Asphaltic Concrete Pavement, complete with the furnishing of ali <br /> necessary equipment, labor and material, for the sum of Four cents (.04) per square <br /> foot. <br /> <br /> Item No. 4. The laying only of Asphaltic Concret~ Pavement, complete <br /> <br /> with the furnishings of all necessary equipment, labor and material, for the s~nu of <br /> Three and ~O/lO0 Dollars ($~.VO) per ton. <br /> <br /> Item No. $. The grading to a subgrade and the laying thereon of a surfac~ <br /> of rock and oil, complete with the furnishing of all necessary equipment, labor and <br /> material, for the sum of five cents ($.0~) per s~uare foot. <br /> <br /> Item No. 6. The excavation for and the construction of Portland Cement <br /> Concrete Curbs, complete with the furnishing of all necessary equipment, labor and <br /> material, for the sum of thirty-one cents ($.31) per linear foot. <br /> <br /> Item No. ~. The excavation for and the construction of Portland cement <br /> <br /> concrete sidewalk, having a total thickness of three and one-half ($ 1/~) inches~ <br />~complete with the furnishing of all necessary equipment, labor and materials, for <br /> the sum of fourteen cents ($.1~) per square foot. <br /> <br /> Item No. 8. The excavation for and the construction of Portland Cement <br /> Concrete Sidewalk, having a total thickness of four (~) inches, complete with the <br /> furnishing of all necessary equipment, labor and material, for the sum of Fourteen <br /> cents ($.1~) per square foot. <br /> <br /> Item No. 9. The excavation for and the construction of Portland Cement <br /> Concrete Sidewalk, having a total thickness of five (S) inches, complete with the <br /> furnishing of all necessary equipment~ labor and material, for the sum of Sixtee~ <br /> cents ($.16) per square foot. <br /> <br /> Item No. 10. The trenching, furnishing and laying of Six (6) inch diamete~ <br /> vitrified clay pipe main sewer, complete with the furnishing of all necessary <br /> equioment, labor and material, for the sum of Sixty-five cents ($.88) per linear <br /> <br /> Item No. ll. The excavation for and the construction of a standard sewer <br /> <br /> lamphole, <br /> furnishing of all necessary equipment, labor and materi~l~ <br /> complete <br /> with <br /> the <br /> <br /> for the sum of Twenty Dollars ($20.00) each. <br /> <br /> Item No. 12. The trenching, furnishing and laying of four (~) inch <br /> diameter vitrified clay pipe house connecting sewer laterals or extensions, complete <br /> with the furnishing of all necessary equipment, labor and material, for the sum of <br /> <br /> <br />