Laserfiche WebLink
forty-five cents ($.45) per linear foot. <br /> <br /> Item No. 13. The trenching, lowering and relaying ~f existing sewer laterals <br />complete with the furnishing of all necessary equipment, labor and material for the sum <br />of Ten Dollars ($10.00) each. <br /> <br /> Item No. 14. The trenching, furnishing and laying of three-quarter (3/4) <br />inch diameter copper pipe house water service connections, complete with the furnishing <br />of all necessary corporation cocks, curb cocks, lead connections and fittings, complete <br />with the furnishing of all necessary equipment, labor and material, for the sum of <br />Fourteen Dollars ($14.00) each. <br /> <br /> Item No. 15. The trenching, furnishing and laying of three-quarter (3/4) <br />inch diameter Byers Wrought Iron Gas House Connecting Services, together with all cocks, <br />fittings and necessary appurtenances thereto, complete with the furnishing Of all <br />necessary equipment, labor and material, for the sum of thirty-five cents ($.35) per <br />linear foot. <br /> <br />of all necessary equipment, <br />(~1400.00) complete. <br /> <br /> Item No. 18. The <br /> <br /> Item No. 16. The trench~.ng, furnishing and laying of two (2) inch diameter <br />Byers Wrought Iron Pipe Gas Main, complete with the furnishing of all necess~ry equipmen$~ <br />labor and material for the sum of fifty cents ($.50) per linear foot. <br /> <br /> Item No. 17. The excavation for and the construction of rail top reinforced <br />concrete culvert according to details for Culvert No. l, complete with the furr~ishing <br /> <br /> labor and material, for the sum of Fourteen Hundred Dollars <br /> <br /> excavation for and the construction of a rail top reinforced <br /> concrete culvert according to details for Culvert No. 2, complete with the furnishing of <br /> all necessary equioment, labor and material, for the su~u of Five Hundred and Ni~ety- <br /> two Dollars ($592.00) complete. <br /> <br /> Item No. 19. The removing of two (2) existing ornamental light standards <br /> <br /> No. i and No. 2, their storable and reinstallation io new locations as shown on the plans <br /> together with the necessar? replacement of concrete foundations, conduit, cables and <br /> supports, complete with the furnishing of all necessary equipment, labor and materials, <br /> for the sum of One Hundred Dollars (,~100.00) complete. <br /> <br /> Item No. 20. The removing of existing ornamental light standard No. 3, its <br /> storage and reinstallation in a new location as shown on the plans, together with the <br /> necessary replacement of concrete foundation, conduit, cables an~] su?ports, complete <br /> with the furnishing of all necessary equipment, labor and material, for the suni of Fifty <br /> Dollars (~;50.00) complete. <br /> <br /> Item No. ~l. The removing of existing ornamental light standard No. 4, its <br />storage and reinstallation in a new location, as shown on the plans, together with the <br />necessary repls~cement of concrete foundation, conduit, cables and supports, complete with <br />the furnishing of all necessary equipment, labor and material, for the sum of Fifty <br />Dollars (~50.00) complete. <br /> <br /> The Clerk of the City of Santa ,~na is hereby directed to post notlce of this <br />award conspicuously for five days on or near the chamber door of the Council Chamber of <br />the Board of Trustees of the City of Santa Ana, and also publish said notice twice in <br /> <br />the "Santa Ana Daily__ . Evening [~egister", a daily newspaper ~,ublmshed~ ' and circulated in the <br />City of Santa Ana, and hereby designated for that purpose by said Board of Trustees. <br /> <br /> <br />