RESOLUTION NO. 2435 <br /> <br />RESOLUTION ACCEPTING PROPOSAL FOR CERTAIN CHANGES <br />IN PROPOSED PLANS AND SPECIFICATIONS FOR CITY HALL, <br />SUBJECT TO APPROVAL OF PUBLIC WORKS ADMINISTRATION. <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF S~NTAANA: <br /> <br /> That certain changes, known as Change Order No. 4, in the plans and <br />specifications for the construction of the City Hall now being erected, be <br />accepted and approved and that the offer of Ball & Honer, General Contractors, for <br />the construction of said City Hall, to make said Changes at certain additions and <br /> <br />deductions in price, be accepted and approved as follows, to-wit: <br /> <br />The items constituting the change order are listed in detail with the <br /> <br />additional cost amounts or credits appearing opposite each item. <br /> <br />ITENS A~DIT!0NS DEDUCTIONS <br /> <br />~. For the omission of the concrete smoke <br />tower and penthouse for same (complete from <br />the first floor to the roof level inclusive) <br />and the substitution of a wooden stair <br />tinuous from the first floor level to the <br />level of the third floor, all as shown by <br />the plans first, ~zaanine, second, third <br />and roof plans of this change order. In <br />this division is included the cost of the <br />additional fire escape complete with land- <br />ings and ladders, railings and etc., all as <br />shown by the drawings. The fire escape is <br />to be of material and with the members de- <br />signed as required by the drawings and the <br />requirements of the Santa Ana Building Code <br />(Uniform Code) Note: that all exterior iron <br />work will be galvanized as per original spec- <br />ificationsi Contractor will furnish~set- <br />ting drawings for approval. <br />For the complete work as described $ $75.41 <br /> <br />2. For the omission of the c0nnecting bridge <br />all as described and detailed by the change <br />order No. 1. Under this change order all <br />drawio~s and specifications relative to the <br />construction and installation of the bridge <br />will become void and the original plans and <br />the specifications ( as first approved) will <br />supersede and will be used in the construct- <br />ion of the building, excepting as wherein <br />they may conflict with the provisions of <br />this change order affecting the changes on <br />the second and third floors. <br /> <br />$ 1350.00 <br /> <br />3. FIRST FLOOR <br /> For the installation of all items and the <br /> construction of all portions of the first <br /> story, caused by the revisions as itemized <br /> in division i of this change order, all ac- <br /> cording to plans and specifications. <br /> Note that the iron gates at the entrance <br />of the basement ramp are omitted and an <br />angle wheel guard installed at the north- <br />east corner of the building. There will <br />also be additional furring on the ceiling <br />of the first story to cover a few project- <br />ing beams <br /> <br />$ 477.$1 <br /> <br />4. NEZZANINE FLOOR <br /> For the construction of a concrete beam <br />and ramp over the ramp to the basement, <br />constructed at the level of the mezz.floor; <br />for the lowering of portions of the mezz. <br />floor, formerly designed as storage space, <br />and as designated on the original drawings <br />as N~ and the north portion of <br />This division includes all changes in con- <br />struction, changes in the electric work, <br />gas heating, partitions and telephone in- <br />stallation, painting, plastering and all <br />other crafts directly or indirectly affect- <br />ed by this change order as shown by both <br />architectural and engineering drawings. <br />Use the original drawings and specifications <br /> <br /> <br />