Laserfiche WebLink
PROJECT TITLE: <br />First Street Slope Stabilization <br />Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Installation of decorative concrete, a stormwater treatment device, <br />and new security fencing along the First Street railroad <br />undercrossing. <br />PROJECT NEED: <br />The railroad undercrossing along First Street, between Standard <br />Avenue and Grand Avenue, consists of four dirt slopes. The dirt slopes <br />are severely eroded, which leads to the discharge of sediment into the <br />street and City stormdrain system during rain events. Additionally, <br />encampments that form at the top of the slopes lead to the discharge of <br />trash and debris. The goal of the project is to improve water quality and <br />address stormwater pollution via the stabilization of the dirt slopes, <br />elimination of trespassing and encampments, and installation of a <br />stormwater treatment device. The project will also significantly enhance <br />the aesthetics of this important gateway to Downtown Santa Ana. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29130 FY 30131 <br />Construction 625,000 - - - - - - <br />TOTAL 625,000 - - - - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30131 <br />ARPA Funds 625,000 - - - - - - <br />TOTAL 625,000 - - - <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Craig Foster, NPDES Manager <br />DATE: <br />04-Jun-2024 <br />