My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Amend CIP for First Street Slope Stabilization Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item 17 - Amend CIP for First Street Slope Stabilization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:19:49 PM
Creation date
7/10/2024 10:30:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />First Street Slope Stabilization <br />Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Installation of decorative concrete, a stormwater treatment device, <br />and new security fencing along the First Street railroad <br />undercrossing. <br />PROJECT NEED: <br />The railroad undercrossing along First Street, between Standard <br />Avenue and Grand Avenue, consists of four dirt slopes. The dirt slopes <br />are severely eroded, which leads to the discharge of sediment into the <br />street and City stormdrain system during rain events. Additionally, <br />encampments that form at the top of the slopes lead to the discharge of <br />trash and debris. The goal of the project is to improve water quality and <br />address stormwater pollution via the stabilization of the dirt slopes, <br />elimination of trespassing and encampments, and installation of a <br />stormwater treatment device. The project will also significantly enhance <br />the aesthetics of this important gateway to Downtown Santa Ana. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29130 FY 30131 <br />Construction 625,000 - - - - - - <br />TOTAL 625,000 - - - - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30131 <br />ARPA Funds 625,000 - - - - - - <br />TOTAL 625,000 - - - <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Craig Foster, NPDES Manager <br />DATE: <br />04-Jun-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.