Laserfiche WebLink
UPDATED COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 22-1341: First Street Slope Stabilization <br />Construction Contract <br />$ <br />4,482,892.00 <br />Contract Administration, Inspection and Testing <br />$ <br />667,108.00 <br />Contingencies <br />$ <br />1,075,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />6,225,000.00 <br />