My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Construction Contract for Council Chambers Restroom and Translation Booth Remodel
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Item 14 - Construction Contract for Council Chambers Restroom and Translation Booth Remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 5:19:36 PM
Creation date
7/10/2024 10:36:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
7/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council Chambers Restroom and Translation Booth Remodel <br />July 16, 2024 <br />Page 2 <br />DISCUSSION <br />The Public Works Agency (PWA) maintains most City facilities, including the Council <br />Chambers Restrooms and Translator Room. Over the last few years, the Council <br />Chambers has undergone renovations including new paint, flooring, and seating. In <br />efforts to continue providing the public, City Council, and staff with a safe and <br />accessible meeting space, the City Manager's Office and Risk Management plan to <br />continue with renovations by modifying the public restrooms to be Americans with <br />Disabilities Act (ADA) compliant and creating a new translation room. The restrooms will <br />be renovated from a male and female restroom to two public single use all gender <br />bathrooms and one ADA all gender restroom. Additionally, there will be one new all <br />gender restroom available only for council members as an enhanced safety measure <br />(Exhibit 1). The new translation (interpreter) room will allow for higher quality <br />translations with a sound controlled space to allow for a larger variety of languages to <br />be translated. This will increase accessibility for more Santa Ana residents to participate <br />in council meetings while also increasing the professionalism of the meetings through <br />greater varieties of translations and higher quality sound control. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, staff specifically reached out <br />to Santa Ana vendors to encourage their participation in bids. A total of three bids were <br />received. Bids were not received from any Santa Ana contractors. The project was <br />advertised in PlanetBids from April 19 through May 10, 2024. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />Loengreen, Inc <br />La Canada, CA <br />$821,440 <br />2 <br />CALTEC Corp. <br />Westminster, CA <br />$1,050,000 <br />3 <br />MLC Constructors Inc <br />Corona, CA <br />$1,185,670 <br />A total of three bids were received and all were deemed responsive. Loengreen, Inc. <br />submitted the lowest responsive base bid in the amount of $821,440 (Exhibit 2). As <br />specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to Loengreen, Inc. for the base bid of <br />$821,440 (Exhibit 3). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management and implementation of the labor requirements. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the estimated total <br />construction delivery cost of the project is $1,108,944 (Exhibit 5). <br />
The URL can be used to link to this page
Your browser does not support the video tag.