My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-07-16 (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
07/16/2024
>
Agenda Packet_2024-07-16 (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 10:47:05 AM
Creation date
7/12/2024 10:31:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Burgess is registered with the Department of Industrial Relations. Our DIR number is <br /> 1000032129. <br /> Burgess is certified by the California DGS as a Small Business. Our SB Certification <br /> number is 9412. <br /> • Personnel and Resource Allocation to the City of Santa Ana <br /> Burgess will assign Nathan Doyel as project manager for the Main Library and Newhope <br /> Library projects. Tom Whitmore will work with him to assist in the management of the <br /> project and allocation of employee and equipment resources. Burgess will allocate up to <br /> (12) men and (4) trucks per day, as well as all necessary equipment and supplies, for the <br /> execution of moving services for these projects. <br /> All crew and equipment will be dispatched from our warehouse at 1625 Iowa Ave, <br /> Riverside, CA 92507. This warehouse is protected with a security alarm and fire <br /> sprinklers, and all Library property will be stored at this location. <br /> • Prior Experience on Similarly-Sized Projects <br /> ➢ Downey City Library <br /> Burgess completed a large project for the Downey City Library in 2019 and 2020. The <br /> project was of similar size and scope as the Santa Ana Main Library project, and <br /> Nathan Doyel was the project manager for the job. The move was accomplished on <br /> very short notice and within an extremely tight time frame to meet the City of <br /> Downey's scheduling requirements. The job consisted of moving approximately <br /> 100,000 volumes (3800 book boxes) to the City's storage site withing the City of <br /> Downey, as well as dismantling and disposing of all library shelving and all library <br /> furniture at a landfill site. The entire move-out was accomplished within three days, <br /> May 1-3, 2019. The move back was accomplished in two days, October 26 & 27, <br /> 2020. The City of Downey was extremely happy with our services, and the City's <br /> project manager, Kathleen Van Raay, wrote a glowing letter of recommendation (see <br /> attached reference letters). <br /> ➢ Riverside Law Library <br /> Burgess completed a large project for the Riverside Law Library. While the project <br /> included fewer volumes than the Downey City Library and the Santa Ana Main <br /> Library, the move was more complicated and challenging. The entire collection <br /> (estimated 50,000 books) was transferred to library carts, moved to Burgess' <br /> warehouse and stored in multiple phases while the library was remodeled. Burgess <br /> handled the unshelving and reshelving of the books for the library. Burgess also <br /> disassembled, moved, and stored on-site most of the library furniture and shelving. <br /> Nathan Doyel was the project manager for the job, and the job was completed over the <br /> course of several months in 2022, with the moving phases lasting 1-2 days each. <br /> City Council 8 - 8 7/16/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.