Laserfiche WebLink
Type Scope of Work <br />Scope of Work <br />■ Review the proposed improvements <br />i <br />for constructability <br />All new development and <br />Dischargers whose projects disturb <br />significant redevelopment projects <br />one (1) or more acres of soil or <br />are required to incorporate Low <br />whose projects disturb less than <br />Impact Development (LID) Best <br />c <br />one acre but are part of a larger common <br />Management Practic-e�o t e maximum <br />rz <br />plan ofde—velopment that in total disturbs <br />Eextent possible. The intent of these <br />> <br />one or more acres are required to obtain <br />requirements is to reduce the discharge of <br />v <br />coverage under the General Permit for <br />R pollutants to receiving water. These are <br />IL <br />Discharges of Storm Water Associated <br />the results of federal and state regulations <br />o <br />with Construction Activity Construction <br />and provide implementation plans to <br />M <br />General Permit Order 2009-0009-DWQ. <br />r protect water quality. Willdan will review <br />o <br />Construction activity subject to this permit <br />the WQMP submitted by applicants to <br />a <br />includes clearing, grading and <br />Car ensure compliance with the requirements. <br />disturbances to the ground such as <br />w <br />stockpiling or excavation, but does not <br />M <br />E <br />include regular maintenance activities <br />performed to restore the original line, <br />m <br />grade, or capacity of the facility. Willdan <br />has several QSD/QSP staff members <br />who are qualified to review SWPPP's if <br />desired by the City. <br />Hydrology/Hydraulics Reports and <br />Storm Drain Plans will be checked <br />Street improvement plans will be <br />'al checked under the direct <br />under the direct supervision of a <br />supervision of a registered civil <br />= registered civil engineer. As applicable, <br />engineer. Improvement plan reviewing <br />i we will perform our work in general <br />will include, but not necessarily be limited <br />o accordance with the following: <br />to, street and drainage plans, sewer and <br />E ■ Check the H/H report for compliance <br />water plans, hydrology and hydraulic <br />o with City and County standards and <br />studies, preliminary drainage studies, <br />N design guidelines. <br />FEMA requirements and design <br />*8 ® Check grading, street, and storm <br />= <br />connections to existingsystems, <br />drain plans for conformance with the <br />E <br />landscape and irrigation, bridges and <br />oo- H/H report. <br />> <br />structures, traffic signal, signing and <br />M ■ Check the H/H report for compliance <br />° <br />striping plans, and park facilities. <br />with City conditions of approval and <br />'5 the approved tentative map. <br />3 Check for any diversion of flows from <br />> their historic patterns. <br />? = Check for any adverse effect of <br />0) drainage on down -stream properties. <br />on Check various plan sets to assure no <br />a` discrepancies from set to set. <br />_ = Review general notes, title block, <br />signature block, benchmark data, <br />quantities, unit costs, vicinity map, <br />index map, and other general <br />requirements. <br />E Specifically. As applicable, we will <br />m perform our work in general accordance <br />` with the following: <br />y Check plans for compliance with <br />general design criteria established by <br />the City standards for street <br />improvements, City and County <br />standards, design guidelines and <br />check all plans for conformance with <br />the street improvement plans. <br />• Check street improvement plans for <br />compliance with City conditions of <br />Proposal for On -Call Plan Checking Services 18 <br />