Laserfiche WebLink
• Check plans for compliance with <br />general design criteria established by <br />the City standards for streets, curbs, <br />gutters, storm drain and flood control <br />systems, and underground wet <br />utilities. <br />• Review hydrology/hydraulic study <br />against the storm drain plans, <br />including street capacities, HGLs, <br />velocities, inlet or outlet control, and <br />other hydraulic factors. <br />■ Review proposed storm drain plans <br />for conformance with the City's <br />approved master plan of drainage. <br />■ Review the proposed improvements <br />for constructability <br />Traffic engineering design plans <br />Q will be checked under the direction <br />W of a state -registered Traffic <br />Engineer. Willdan's plan review staff has <br />the capability to review traffic design <br />r plans, including, but not necessarily be <br />O1 limited to, traffic signals, signing and <br />striping, street lighting, temporary traffic <br />` control and construction detours, flashing <br />y beacons, EV charging stations, <br />cii $ pedestrian and bicycle facilities, and <br />Qp circulation plans. As needed, Willdan's <br />c plan review staff can also review and <br />v 1 ° prepare comments on documents, such <br />5 as traffic studies related to a development <br />= y project. As applicable, we will perform our <br />c work in general accordance with the <br />in v following: <br />r/i c • Check design plans for compliance <br />`0 with general design criteria <br />a R established by the City standards for <br />a traffic signals, signing and striping, <br />a� and streetlights. <br />in Check design plans for compliance <br />with City and/or County standards, <br />Caltrans standard plans, and <br />1- California Manual on Uniform Traffic <br />Control Devices (CA MUTCD). <br />■ Check design plans to ensure all <br />improvements are shown, as required <br />by the City's conditions of approval for <br />the proposed development project and <br />mineral_ Ilan requirements. _ <br />approval and the approved tentative <br />map. <br />Check street improvement plans and <br />plans against easement documents, <br />record maps, and right-of-way <br />documents; and determine the need <br />for permanent easements, additional <br />right-of-way, or temporary <br />easements. <br />Review pavement design for <br />consistency with the <br />recommendations of the soils <br />engineer. <br />Traffic studies including Traffic <br />�i� Impact Analysis, Parking <br />Demand, Traffic Circulation, Traffic <br />Signal Warrant, Street Lighting <br />Photometrics will be checked under the <br />direct supervision of a registered Traffic <br />Engineer. As applicable, we will perform <br />our work in general accordance with the <br />following: <br />m • Review of studies for conformance <br />with Conditions of Approval <br />y ■ Review for conformance between <br />o plans and studies <br />• Review Methodology and <br />F Assumption per the memorandum of <br />understanding <br />■ Review Data including collision <br />history, Average Daily Traffic Counts, <br />Turning Movement Counts, Trip <br />Generation and Trip Distribution. <br />• Review thresholds of significance for <br />delay and V/C ratio <br />• Review of VMT methodology and <br />findings. <br />• Review Impacts and <br />Recommendations <br />Proposal for On -Call Plan Checking Services 19 <br />