Laserfiche WebLink
v Willdan's review of easement <br />c 1 1 documents, lot line adjustments, <br />E dedications, vacations, quitclaims, <br />E <br />N Parcel and Tract Maps shall be by or <br />' under the direction of a Licensed Land <br />Surveyor to assure compliance with <br />= applicable provisions of the Subdivision <br />Map Act, County ordinances, and other <br />c conditions-of-approval-and-requirements- <br />_J There will be detailed checks made, <br />including, but not limited to, review of <br />survey documentation and title reports, lot <br />E and boundary closures, dedication and <br />U) easement provisions, legal descriptions, <br />w completeness, and accuracy of data <br />ci notation, and necessary certifications of <br />m City and County staff. If required, Willdan <br />rn <br />`m can sign maps in the capacity of the City <br />2 Surveyor. <br />0 <br />J <br />c. <br />A <br />u <br />f— <br />aa) <br />�2 <br />oL. <br />) <br />Schedule <br />Willdan provides complete <br />structural engineering support for <br />design, analysis, inspection, and <br />evaluation of structural systems. Our staff <br />performs bridge advance planning <br />studies and analyzes and designs <br />bridges, sound walls, retaining walls, <br />'E w signal pole foundations and buildings. <br />1 on new, replacement, or rehabilitated <br />o bridges; cofferdams; tie -back walls; <br />demolition; falsework and form design; <br />v bridge scour plans of action; and design <br />t`p E of work trestles and temporary bridges for <br />a; construction. Our staff members have <br />ae y designed weirs, spillways, box culverts, <br />rn lined channels, custom -designed <br />manhole inlets, and pipe protection. In <br />N r addition, our staff has in-depth <br />u u knowledge of all federal, state, and local <br />F N criteria and methodologies including but <br />not limited to Caltrans, AASHTO, ACI, <br />and AISC criteria and methods for <br />reviewing plans, preparing project <br />j development documents, design, <br />construction documents, and processing <br />design of new bridges and bridge <br />widenings, including the latest seismic <br />analysis and design rocedures._ <br />Willdan understands that timelines are of the essence when reviewing development projects. From our <br />experience we have learned that having a standardized schedule streamlines the plan check process <br />and manages developer expectations. We are proposing to have a standard schedule for all reviews to <br />show simplicity in the process and alleviate any undue burden of adjusting the schedule for all types of <br />reviews. The below schedule has been proven to work properly with a variety of agencies. Expedited <br />reviews can be done for a fee of 1.5 times the regular plan review cost which is outlined in the attached <br />sealed fee proposal. Here are the standard review timelines proposed for this contract. <br />Regular Plan Review <br />Fifteen (15) working days for the V plan check <br />Ten (10) working days for subsequent plan checks <br />Expedited Plan Review <br />y <br />Ten (10) working days for 1st plan check <br />Five (5) working days for subsequent plan checks <br />Willdan can ramp up resources as necessary to <br />expedite a project that the City deems a high priority to help meet any specific project milestones when <br />needed. <br />Fee Proposal <br />Per the City's RFP, a fee proposal has been submitted under a separate sealed envelope. <br />Proposal for On -Call Plan Checking Services 20 <br />