My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE III - ARPA/CSLFRF)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE III - ARPA/CSLFRF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 2:51:47 PM
Creation date
7/29/2024 9:45:50 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
P22-1407
Agency
Public Works
Council Approval Date
6/6/2024
Insurance Exp Date
9/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO.1 <br /> PROPOSAL <br /> PROJECT NO.: 22-1407 <br /> PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE IIIāARPA I CSLFRF <br /> BID PROPOSAL <br /> TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br /> FROM: EBS General Engineering, Inc. <br /> REQUIREMENT: <br /> The undersigned bidder declares that they have carefully examined the location of the proposed <br /> work, that they have examined the Contract Documents in its entirety and hereby proposes to <br /> furnish all material and do all the work required to complete the said work in accordance with <br /> said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br /> following schedule: <br /> Item Description Qty Unit Unit Price Amount <br /> 1 Signing and Striping 1 LS $ $ <br /> 24,350.00 24,350.00 <br /> 2 Remove and Construct PCC 1900 SF $ $ <br /> Sidewalk(T=4")* 14.00 26,600.00 <br /> 3 Construct PCC Curb Ramp* 475 SF $ $ <br /> 35.00 16,625.00 <br /> 4 Unclassified Excavation* 100 CY $ 291.00 $29,100.00 <br /> 5 Construct PCC Curb and Gutter 380 LF $ $ <br /> (Type A-2-6)* 104.00 39,520.00 <br /> 6 AC Pavement* 5 TN $ $ <br /> 1550.00 7750.00 <br /> 7 Install Truncated Domes 19 EA $ 1215.00 $ 23,085.00 <br /> 8 Install Raised Crosswalk at French 1 LS $ $ <br /> St and Vance St 13,735.00 13,735.00 <br /> 9 Install Raised Concrete Traffic 1 LS $ $ <br /> Circle at 9th St and Spurgeon St 18,795.00 18,795.00 <br /> 10 Furnish&Install Complete 1 LS $ $ <br /> Functioning Carmanah RRFB 12,080.00 <br /> System per Plan at the Intersection 12,080.00 <br /> of French St and Vance St <br /> 11 As-Built Plans 1 LS $5,000 $ <br /> 5000.00 <br /> 12 Project Advertising Signs 1 EA $ $ <br /> 2178.00 2178.00 <br /> 13 Construction Permits 1 LS $5,500 $ <br /> 5500.00 <br /> P-1 of P-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.