My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE III - ARPA/CSLFRF)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE III - ARPA/CSLFRF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 2:51:47 PM
Creation date
7/29/2024 9:45:50 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
P22-1407
Agency
Public Works
Council Approval Date
6/6/2024
Insurance Exp Date
9/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO.1 <br /> PROPOSAL <br /> PROJECT NO.: 22-1407 <br /> PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE III —ARPA I CSLFRF <br /> Item Description Qty Unit Unit Price Amount <br /> 14 Crushed Miscellaneous Base* 2 TN <br /> 2345.00 4690.00 <br /> 15 Remove Existing Manhole 1 EA <br /> Structure 4000.00 4000.00 <br /> 16 Construct New P.C.C. Sewer 1 EA 5600.00 5600.00 <br /> Manhole <br /> TOTAL BASE BID—BID ITEMS 1-16 $ 238,608.00 <br /> The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br /> right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). <br /> * The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br /> subject to the "25%"limit as stated in Section 3-2 of the Standard Specifications. The actual <br /> amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br /> right to increase or decrease the quantity of this item accordingly. <br /> j This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br /> TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br /> The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br /> shown above, within fifty (50) working days after the commencement date stated in the Notice to <br /> Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for <br /> long-lead time items. Work shall be completed by December 30,2024. <br /> The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br /> Standard Specifications, shall be $3,600 per calendar day. <br /> Name of Firm EBS General Engineering, Inc. <br /> (5 _-_Signature of BIDDER <br /> Title Joseph Nanci,Vice President <br /> (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of <br /> all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br /> and names of President, Secretary,Treasurer and Manager,thereof.) <br /> P-2 of P-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.